期刊首页 优先出版 当期阅读 过刊浏览 作者中心 关于期刊 English

《工程(英文)》 >> 2016年 第2卷 第4期 doi: 10.1016/J.ENG.2016.04.002

三峡工程运行以来的几个问题思考

Changjiang Water Resources Commission, Ministry of Water Resources, Wuhan 430010, China

录用日期: 2016-11-24 发布日期: 2016-12-28

下一篇 上一篇

图片

图1

图2

图3

参考文献

[ 1 ] Project Team for TGP’s Staged Assessment of Chinese Academy of Engineering. TGP’s staged assessment report. Beijing: China Water & Power Press; 2010. Chinese.

[ 2 ] Project Team for TGP Assessment during Trial Impoundment Period of Chinese Academy of Engineering. Assessment report on TGP assessment during trial impoundment period. Beijing: China Water & Power Press; 2014. Chinese.

[ 3 ] China Three Gorges Corporation. Report on construction quality of TGP and project operation in 2014. 2015. Chinese.

[ 4 ] Zheng S. Discussion on TGP’s flood resources utilization and exerting integrated benefit. Yangtze River 2013;44(15):1–6. Chinese.

[ 5 ] China Three Gorges Corporation. Report on construction quality of TGP and project operation in 2015. 2016. Chinese.

[ 6 ] Zheng S. Discussion on hydropower resources development and environmental & ecological protection in China. Eng Sci 2006;8(6):1–6. Chinese. 链接1

相关研究