《工程(英文)》 >> 2017年 第3卷 第6期 doi: 10.1016/j.eng.2017.12.007
中国大陆典型水下隧道工程案例与技术
State Key Laboratory of Shield Machine and Boring Technology, China Railway Tunnel Group Co., Ltd., Zhengzhou 450001, China
下一篇 上一篇
摘要
参考文献
[ 1 ] State Oceanic Administration, People’s Republic of China. 2015 island bulletin. Report. Beijing: State Oceanic Administration, People’s Republic of China. 2016 Nov. Chinese.
[ 2 ] Wang M. Current developments and technical issues of underwater traffic tunnel—Discussion on construction scheme of Taiwan Strait undersea railway tunnel. Chin J Rock Mech Eng 2008;27(11):2161–72. Chinese. 链接1
[ 3 ] Hong K. State-of-art and prospect of tunnels and underground works in China. Tunn Constr 2015;35(2):95–107. Chinese.
[ 4 ] Hong K. Case study of hard rock treatment technology and shield docking technology in boring of underwater tunnels. Tunn Constr 2012;32(3):361–5. Chinese. 链接1
[ 5 ] He Y. Key construction technologies for Honggu Immersed Tunnel located in Inland River in Nanchang. Tunn Constr 2016;36(9):1085–94. Chinese.
[ 6 ] Sun Z. Case study of construction technology for deep weathered slots of Xiang’an Subsea Tunnel in Xiamen. Tunn Constr 2009;29(S2):74–81. Chinese.
[ 7 ] Zhu Q. Study of application of 3-boom hydraulic rock drilling jumbos in construction of Jiaozhou Bay Subsea Tunnel in Qingdao. Tunn Constr 2010;30 (6):670–4. Chinese. 链接1
[ 8 ] Hong K, Du C, Wang K. Shield tunneling technology of Shiziyang subaqueous tunnel of Guangzhou–Shenzhen–Hongkong High-Speed Railway. Eng Sci 2009;7:53–8. Chinese. 链接1
[ 9 ] Hong K. Study of the structural and mechanical performance of underwater shield-bored high speed railway tunnels and the boring and docking technologies [dissertation]. Beijing: Beijing Jiaotong University; 2011.
[10] Liu H, Liang K, Duan J. Application of marine seismic reflection CDP stacking technology in detection of weathered granite boulder: case study of water intake tunnels of Taishan Nuclear Power Station. Tunn Constr 2011;31 (6):657–61. Chinese. 链接1
[11] Yang Y. Boulder prospecting technologies for sea-crossing shield tunneling. Tunn Constr 2012;32(5):700–4. Chinese. 链接1
[12] Lu Y, Liu H, You Y, Xu C. Key techniques for the pretreatment of boulder blasting in an under-sea shield-driven tunnel. Mod Tunn Technol 2012;5:117–22. Chinese.
[13] You Y, Liang K. Risk analysis on blasting of boulder and bedrock intrusion in sea-crossing tunnel bored by shield machine. Tunn Constr 2012;32(S2):31–6. Chinese.
[14] Wei Y. Research on key technologies for scheme design of Su’ai Tunnel in Shantou. Tunn Constr 2017;37(2):200–6. Chinese.
[15] Wang M. Tunneling by TBM/shield in China: state-of-art, problems and proposals. Tunn Constr 2014;34(3):179–87. Chinese.