Content
Frontiers of Structural and Civil Engineering >> 2009, Volume 3, Issue 3 doi: 10.1007/s11709-009-0047-9
Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge
1.Jinling Institute of Technology, Nanjing 210001, China; 2.Headquarter of Building DA Sheng-guan Bridge, Nanjing 210000, China;
Abstract
Keywords
PHP slurry ; KTY4000 drilling machine ; KPG3000A drilling machine ; spread drill
Content