Construction Duration and Cost Simulation via Network-Program-Diagram
1. Department of Civil Engineering, Central South University, Changsha 410075, China.2. National Engineering Laboratory for High Speed Rail Construction, Changsha 410075, China.3. The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China.4. Costing Department of Economic Planning Institute of the Ministry of Railways, Beijing 100038, China
Abstract
Keywords
construction duration ; construction cost ; activity-on-node diagram ; building information modeling