Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2004, Volume 6, Issue 5

Task Arrangement of the IPD Process Plan

Institute of Industrial Engineering, Zhejiang University of Technology, Hangzhou 310032, China

Funding project:国家自然科学基金资助项目(70271032) Received: 2003-10-29 Revised: 2004-02-08 Available online: 2004-05-20

Next Previous

Abstract

This paper is related to task arrangement of the IPD process plan. The IPD task feature is discussed in regard to coupling and administrative levels. The stratified and distributing IPD process plan strategy is built. The task arrangement modeling and related Hungary algorithms is given with conception of cost matrix, and then related examples are demonstrated.

Figures

图1

图2

图3

图4

图5

References

[ 1 ] Vajna S, Burchardt C. Integrated product development[J]. Industrial Engineering and Management, 1999, 4 (3) : 40~50

[ 2 ] DikLL .Integratedproductand processdatemanagement[J].IntegratedComputerAidedEngineering, 1996, 3 (1) :1~4

[ 3 ] Westfechted B. Integrated product and process management for engineering design applications[J]. Integrated Computer-Aided Engineering, 1996, 3 (1) : 20~35

[ 4 ] Kusiak A, Wang J. Decomposition of the design process[J]. Journal of Mechanical Design, 1993, 115 (12) : 687~695

Related Research