Short-Range Current Velocity Records to Apply in the Reference Period for Sutong Bridge

The Key Laboratory for RC and PC Structures of Ministry of Education, School of Civil Engineering, Southeast University, Nanjing 210096, China

Funding project:江苏省高校自然科学研究计划资助项目(04KJD560074);江苏省“青蓝工程”中青年学术带头人资助项目 Received: 2005-09-15 Revised: 2005-11-25 Available online: 2006-07-20

Next Previous

Abstract

The current velocity of reference period is determined by the local primitive data. A method is introduced to determine the current velocity of reference period through short-range current velocity records for the area that lacks of long-range current velocity records. According to short-range current velocity records of Sutong Bridge the probability distribute mode of the current velocity is established. Presuming the extreme value by way of minority sample,the current velocity of reference period is calculated.Correlation analysis is carried out, the rationality of the calculation is validated and the regression equation is established. The calculated results provide credible technical guide to devise and construct Sutong Bridge and ensure current and wave resistance safety.

Figures

图1

图2

图3

References

[ 1 ] 胡文辉, 阮静.润扬长江公路大桥桥位风速观测及设计风速计算[J].公路交通科技, 2004, (2) :41~43 link1

[ 2 ] 沈恒范.概率论与数理统计教程[M].北京:高等教育出版社, 1996.90~111, 195~202, 276~289 link1

[ 3 ] 袁子厚, 何英明, 吴桂英.对数正态分布随机变量在设计基准期内的最大值分布[J].中国农村水利水电, 2001, (1) :35~37 link1

[ 4 ] 金伟良, 沈照伟, 李海波.结构可靠度分析中设计基准期的敏度分析[J].中国海洋平台, 2003, (10) :15~18 link1