Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 7

Analysis and research for risk assessment criteria of underground engineering

1. Research Institute of Tunnelling & Underground Works, Beijing Jiaotong University, Beijing 100044, China;

2. Beijing Municipal Institute of Hydraulic Engineering Planning, Design & Research, Beijing 100032, China

Received: 2009-05-22 Available online: 2009-07-10 14:46:04.000

Next Previous

Abstract

In this paper, the characteristics of underground works and constructive guidelines for risk assessment of underground works were intro.The results of the research were successfully applied to the study of the Beijing Municipal City Planning and Design of the underground road system.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 罗云,樊运晓,马晓春,等.风险分析与安全评价[M].北京:化学工业出版社,2004

[ 2 ] Schofield S.Offshore QRA and the ALARP principle [ J] .Relia- bility Engineering and System Safety, 1998 , 61 ( 1 ) :31 -37 link1

[ 3 ] 高建民,杨建安.技术风险评估研究[J].科技进步与对策,2001,(2):129-131 link1

[ 4 ] Ohtsubo H, Sumi Y.Committee report on risk assessment [ A] . Proceedings of the 14 th International Ship and Offshore Structures Congress[ C] .Nagsaki,2000

[ 5 ] Bottelberghs P H.Risk analysis and safety policy developments in the Netherlands [ J ] .Journal of Hazardous Materials, 2000 , 71 ( 1 -3 ) : 59 -84 link1

[ 6 ] 胡群芳,黄宏伟.隧道及地下工程风险接受准则计算模型研究[A].全国安全风险会议[C].北京,2005

Related Research