Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 7

Erection technique of steel box-girder at anchor-side of north side span in Xihoumen suspension bridge

1. Sihcuan Road & Bridge Construction Group Co.Ltd., Chengdu 610041,China;

2. Zhejiang Provincial Construction Headquarters of Zhoushan Islands Link Project, Zhoushan, Zhejiang 316000, China;

3. Southwest Municipal Engineering Design & Research Institute of China, Chengdu 610081, China

Funding project:国家科技支撑计划项目(2008BAG07B04) Received: 2010-05-05 Available online: 2010-07-16 15:44:51.000

Next Previous

Abstract

Xihoumen Bridge is the longest two-span continuous steel box girder suspension bridge in China. Several problems have been encountered due to severe natural environment during the erection of steel box girder at anchor-side of north side span of the bridge. The key technique and construction process of erection and linetype adjustment for the steel box girder are introduced.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 钱冬生,陈仁福.大跨悬索桥的设计与施工(修订版)[M].成都:西南交通大学出版社,1999

[ 2 ] 牛和恩.虎门大桥工程第二册·悬索桥[M].北京:人民交通出版社,1988

[ 3 ] 潘世建,杨盛福.东航道悬索桥·海沧大桥建设技术第四册[M].北京:人民交通出版社,2001

[ 4 ] 吴胜东.润扬长江公路大桥建设第三册·悬索桥[M].北京:人民交通出版社,2005

[ 5 ] NielsJ.Gimsing编,西南交大土木学院桥梁系与中铁大桥局桥研院译,钱东生校.大贝耳特海峡:东桥[M].成都:西南交通大学出版社,2008

[ 6 ] 卢伟,邓亨长,龙勇,等.西堠门大桥钢箱梁安装[J].公路,2009,1:59-65 link1

[ 7 ] 唐茂林,许宏亮,沈锐利,等.西堠门大桥无索区梁段线形调整与控制[J].公路,2009,1:43-47 link1

Related Research