Abstract

In the paper, the segment assembling techniques of large-diameter shield were summarized, and the apparent damage reasons and repair technology of large-diameter shield reinforced concrete segment in the construction were preliminarily analyzed, based on research of the underground diameter project from Beijing railway station to Beijing railway west station. The different repair methods were proposed for the segments above hance and below hance, respectively, assuring the good strength and surface quality of large-diameter shield segment.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 楼如岳.最新泥水盾构施工技术[J].上海隧道股份,2003(3):27-30.

[ 2 ] 刘建航,侯学渊.盾构法隧道[M].北京:中国铁道出版社,1991.

[ 3 ] 张凤祥,朱合华,傅德明.盾构隧道[M].北京:人民交通出版社,2004.

Related Research