Strategic Study of CAE >> 2011, Volume 13, Issue 7

Operation and regulation of Three Gorges Reservoir

China Three Gorges Corporation, Yichang Hubei 443002, China

Received: 2011-04-25 Available online: 2011-07-08 15:18:03.000

Next Previous

Abstract

Since the impoundment of Three Gorges Reservoir in 2003, the construction schedule, resettlement and geological hazard treatment were ahead of those in the preliminary design. The sedimentation conditions were obviously better than expected, and the goal of stage-by-stage impoundment was achieved in advance. Simultaneously, with the changes in operating conditions, optimum operations such as floating control of flood limit water level, medium and small flood regulation and impounding in advance were carried out, which produced enormous comprehensive benefits in flood control, drought relief, navigation, water supply and ecology. Especially during the flood season in 2010, the flood retention and storage capacity reached totaled 26.6 billion m3 through medium and small sized flood regulation, and the flood resources were fully utilized. In the end of the flood season, the flood resources were fully utilized and the water lever reached 175 m first with the joint operation of flood control and water storage. Then the project began to give full play to its comprehensive benefits during the normal operation period.

Figures

图1

References

[ 1 ] 水利部长江水利委员会.长江三峡水利枢纽初步设计报告[R].1992.

[ 2 ] 胡兴娥,冯正鹏.浅谈三峡水库139m水位蓄水[J].水力发电,2003(12):22-26. link1

[ 3 ] 长江水利委员会水文局.三峡工程汛期洪水特性专题研究报告[R].2007.

[ 4 ] 长江勘测规划设计研究有限责任公司.长江三峡水利枢纽2010年度汛方案专题研究报告[R].2010.

[ 5 ] 中国水利水电科学研究院.三峡水库提前蓄水对库区泥沙淤积影响计算分析[R].2010

Related Research