Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2011, Volume 13, Issue 8

Performance evaluation of coordinated management of construction projects

School of Civil Engineering and Architecture, Central South University, Changsha 410075, China

Received: 2011-06-09 Available online: 2011-08-23 08:44:10.000

Next Previous

Abstract

The combination of both function coefficient method and logframe approach was employed to construct the performance evaluation index system of coordinated management of construction projects. The evaluation index system of coordinated management of construction projects was constructed from four aspects, including performance evaluation of target coordinated management, organization coordinated management, interest party coordinated management, and sustainable development of project and organization. In addition, the way was given to calculate the comprehensive performance evaluation coefficient of coordinated management of construction projects, quantifying the evaluation of the performance of the coordinated management of construction projects. In the end, the method to construct index system and calculate the coefficient was proved by an empirical study. This method can judge the function of coordinated management of construction projects efficiently.

Figures

图1

图2

图3

References

[ 1 ] 郭峰,王喜军.建设项目协调管理[M].北京:科学出版社,2009.

[ 2 ] 郭峰,高冬梅.建设项目协调管理绩效的关键影响因素分析[J].科技进步与对策,2010(19):27-30. link1

[ 3 ] 刘历波,潘家平.工程建设项目集成管理绩效评价指标体系研究[J].河北工程大学学报(社会科学版),2008,25(1):9-10. link1

[ 4 ] 张飞涟,周继祖.铁路建设项目可持续发展评价[J].铁道学报,2002(1):93-96. link1

[ 5 ] 华晓龙,李国平.我国非再生能源资源定价改革构想[J].人文杂志,2008(3):86-91. link1

[ 6 ] Cheng Minyuan, Tsai MinHsiu, Xiao Zhiwei.Construction man- agement process reengineering: Organizational human resource planning for multiple projects [ J ] .Automation in Construction, 2006 ( 15 ) :785 -799. link1

[ 7 ] 冯丽霞,陈义.完善工程项目绩效评价指标体系的思考[J].长沙理工大学学报,2005,20(1):51-53. link1

[ 8 ] 袁庆明.新制度经济学[M].北京:中国发展出版社,2005:346.

[ 9 ] 拉里·雷诺兹.大雁的力量:信任创造绩效[M].广州:广东经济出版社,2006.

[10] 杜亚灵,尹贻林.公共项目管理绩效的形成机理研究[J].项目管理技术,2008,6(7):13-17. link1

[11] Guo Feng, Shi Bijuan.Reflection on coordinated management of railway construction project based on the sustainable development [ J] .ISMR, 2008 ( 10 ) : 410 -415.

[12] 张双甜.项目可持续发展影响因素分析[J].项目管理,2001(8):76-77. link1

[13] 张先锋.工程项目管理的新挑战———可持续发展[J].资源环境与工程,2004,18(3):88-91. link1

[14] 郑晓晴,潘晓丽.试论建设项目的可持续性[J].重庆大学学报,2002,24(2):83-92. link1

[15] 理查德·威廉姆斯.组织绩效管理[M].北京:清华大学出版社,2002.

Related Research