Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2011, Volume 13, Issue 11

Optimization of centralized cooling schemes in Kongzhuang Coal Mine

Shanghai Datun Energy Co., Ltd., Peixian,Jiangsu 221611,China

Received: 2011-08-30 Available online: 2011-11-18 14:20:59.000

Next Previous

Abstract

According to the cross-section layout of Kongzhuang Coal Mine shaft and mine production conditions, the paper summarized and analyzed the systems of slice ice cooling, the thermo-power glycol cooling, HEMS underground centralized cooling, and vacuum ice cooling. From the effect, investment, cooling system operating stability, thermal transportation pipe installation, quality of water, discharge of heat underground, and other comprehensive consideration of the centralized cooling plan, the suitable way of cooling the mine is only the vacuum ice cooling scheme. Meanwhile, through implementation of the project, it will fill a centralized cooling technology gap in ice making technology, ice transportation pipes, ice transportation process, pressurized air cooling, underground ice melting technology, and energy-saving technology in ice making, which is a great breakthrough in our coal mines.

Figures

图1

图2

图3

图4

图5

References

[ 1 ] 中华人民共和国 建 设 部,中 华 人 民 共 和 国 国 家 质 量 监 督 检 验 检疫总局.GB50215-2005 煤炭工业 矿 井 设 计 规 范 [ S ] .北 京: 中国计划出版社,2005.

[ 2 ] 中华人民共和国 建 设 部,中 华 人 民 共 和 国 国 家 质 量 监 督 检 验 检疫总局.GB50418-2007 煤矿井下热害防治设计规范[ S] .北 京:中国计划出版社,2007.

[ 3 ] 卫修君,胡春胜.矿 井 降 温 理 论 与 工 程 设 计 [ M] .北 京:煤 炭 工业出版社,2008.

[ 4 ] 袁 亮.淮南矿区矿井降温研究与实践[ J] .采矿与安全 工程 学报,2007 ,24 ( 3 ) :298 -301. link1

[ 5 ] 何满潮,郭平业,陈学谦,等.三河尖矿深井高温体特征及其热 害控制方法 [ J] .岩石 力学 与工 程学 报,2010 ,29 ( 增 1 ) : 2593 -2597. link1

Related Research