300 m grade concrete faced rockfill dam adaptability and countermeasures

Huaneng Lancang River Hydropower Co., Ltd, Kunming 650214, China

Received: 2011-09-20 Available online: 2011-12-13 11:18:07.000

Next Previous

Abstract

This paper summed up the main experiences and lessons of 200 m grade rockfill dam construction,analyzed 4 typical projects of 300 m grade dam, put forward the scientific research and key technical problems of 300 m grade dam.