Strategic Study of CAE >> 2011, Volume 13, Issue 12
300 m grade concrete faced rockfill dam adaptability and countermeasures
Huaneng Lancang River Hydropower Co., Ltd, Kunming 650214, China
Next Previous
Abstract
This paper summed up the main experiences and lessons of 200 m grade rockfill dam construction,analyzed 4 typical projects of 300 m grade dam, put forward the scientific research and key technical problems of 300 m grade dam.