Key construction techniques for superstructure of the Fourth Nanjing Yangtze River Bridge

CCCC SHEC Fourth Engineering Company Ltd., Wuhu, Anhui 241007, China

Received: 2013-05-22 Available online: 2013-08-28 08:26:08.000

Next Previous

Abstract

The Fourth Nanjing Yangtze River Bridge, the longest suspension bridge in China, as well as the third one in the world, is a two-tower three-span suspension bridge with the main span of 1 418 m. The key construction techniques for the superstructure, including lifting and installation of the cable saddles, erection of the traction system, walkways and main cables, rearrangement of the main cables, installation of the suspender cables and the cable clamps, erection of the steel box girders and wrapping of the main cables, are discussed in detail in this paper. It can provide some references for the construction of the superstructures for the similar suspension bridges in the future.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

References

[ 1 ] 周昌栋,谭永高,宋官保,等. 悬索桥上部结构施工[M]. 北京: 人民交通出版社,2004.

[ 2 ] 喻胜刚,沈良成,牛亚洲,等. 润扬大桥悬索桥索鞍吊装施工 技术[J]. 桥梁建设,2004(4):21-24. link1

[ 3 ] 卢 伟,邓亨长,龙 勇,等. 西堠门大桥钢箱梁安装[J]. 公 路,2009,1(1):59-65. link1

Related Research