Construction technology of tower column of Three Gorges Project ship lift

China Gezhouba Group Co., Ltd. Three Gorges Company, Yichang, Hubei 443002

Received: 2013-06-27 Available online: 2013-09-10 13:09:01.000

Next Previous

Abstract

This paper firstly describes the whole construction program of the tower column. Then the important and difficult construction problems have been analyzed, such as the precision control of civil structure, the precision control of metal structures and its embedded parts, concrete temperature control and crack prevention, and safety control. At the same time, the construction surveying control technique, the temperature control and crack prevention technique of thin wall concrete, high precision concrete continuous and rapid construction technique,metal structure construction technique,and the construction technique of high altitude and large span beam structure have been made a systemic summary. The application of those construction techniques meets the requirement of high precision construction of the tower column and ensures its smooth construction. Meanwhile, these construction techniques lay a solid foundation for the construction of similar projects.

Figures

图1

图2

图3

References

[ 1 ] 梁仁强,李 峰. 三峡升船机施工技术研究与实践[J]. 人民长 江,2011,42(16):51-55. link1

[ 2 ] 苏海东,谢小玲,祁勇峰. 三峡升船机塔柱联系梁三维有限元内 力计算[J]. 长江科学院院报,2009,26(1):38-41. link1

[ 3 ] 钮新强,覃利明,于庆奎. 三峡工程齿轮齿条爬升式升船机设计 [J]. 中国工程科学,2011,13(7):96-103. link1

[ 4 ] 钮新强. 三峡升船机结构关键技术研究[D]. 武汉:华中科技大 学,2005. link1

[ 5 ] 郭 彬,金海军,曹怀志. 三峡升船机关键技术问题[J]. 水力发 电,2009,35(12):79-81. link1

[ 6 ] 杨 红,李俊波. 三峡升船机船厢室段关键金属结构安装技术 研究与实践[J]. 中国水运,2012,12(11):221-223. link1

[ 7 ] 张俊松. 三峡升船机齿条、螺母柱一期埋件安装[J]. 价值工程, 2011,31(30):41-43. link1

[ 8 ] 王建平,聂本武,李 智. 三峡升船机立体交叉作业的风险控制 措施研究[J]. 安全与环境工程,2013,20(1):147-150. link1

Related Research