Resource Type

Journal Article 810

Conference Videos 44

Year

2023 9

2022 67

2021 81

2020 49

2019 53

2018 36

2017 62

2016 26

2015 36

2014 26

2013 53

2012 36

2011 49

2010 46

2009 45

2008 30

2007 31

2006 26

2005 12

2004 8

open ︾

Keywords

construction 28

ecological civilization 17

construction management 15

construction technology 10

Three Gorges Project 9

different 9

system construction 9

sustainable development 7

BIM 6

construction industry 6

construction project 5

project management 5

simulation 5

Sutong Bridge 4

Three Gorges Project ship lift 4

ecological civilization construction 4

green construction 4

ship lift 4

suspension bridge 4

open ︾

Search scope:

排序: Display mode:

Analyzing construction safety through time series methods

Houchen CAO, Yang Miang GOH

Frontiers of Engineering Management 2019, Volume 6, Issue 2,   Pages 262-274 doi: 10.1007/s42524-019-0015-6

Abstract: The construction industry produces a large amount of data on a daily basis.However, existing data sets have not been fully exploited in analyzing the safety factors of constructionVarious time series (TS) methods were adopted for identifying the leading indicators or predictors ofconstruction accidents.The data set used herein was obtained from a large construction company that is based in Singapore and

Keywords: time series     temporal     construction safety     leading indicators     accident prevention     forecasting    

Key uncertainty events impacting on the completion time of highway construction projects

Alireza MOGHAYEDI, Abimbola WINDAPO

Frontiers of Engineering Management 2019, Volume 6, Issue 2,   Pages 275-298 doi: 10.1007/s42524-019-0022-7

Abstract: time, on highway projects in South Africa.time.It emerged from the study that the uncertainty events affecting the construction time of highway projectstime differently, through a combination of the uncertainty events of the individual construction activitiesthat construction time on South African highway projects is significantly related to the social and

Keywords: ANFIS     construction time     impact assessment     highway project     South Africa     uncertainty    

Negative weights in network time model

Zoltán A. VATTAI, Levente MÁLYUSZ

Frontiers of Engineering Management 2022, Volume 9, Issue 2,   Pages 268-280 doi: 10.1007/s42524-020-0109-1

Abstract: Time does not go backward.A negative duration, such as “time period” at first sight is difficult to interpret.parameters in time model.models and discuss approximately 20 types of time-based restrictions among the activities of constructiontime-cost trade-off, resource allocation or other constraints).

Keywords: graph technique     network technique     construction management     scheduling    

Theory and application of system integration in real-time control on high arch dam construction

Ren Bingyu,Wu Binping

Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 12,   Pages 84-90

Abstract:

A method of applying system integration theory to real-time control onhigh arch dam construction was proposed to fit the strong complexity and randomness in the constructionA system integrated framework of real-time control on high arch dam construction was designed.Finally, a real-time control system based on the network platform was built up.theory and the system can realize integrated control and analysis dynamically, and improve the dam construction

Keywords: real-time control     system integration     data integration     network platform     high arch dam construction    

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 12,   Pages 20-27

Abstract: The conventional quality control methods exhibit difficulty to ensure construction quality of high coreReal-time compaction quality monitoring technology of high core rock-fill dam, real-time entire-processmonitoring technology of dam materials transportation and real-time acquisition technology for dynamicIn addition, based on an established mathematical model of concrete dam schedule real-time control, themethod of timely warning and dynamic adjustment of construction schedule is proposed to provide means

Keywords: high core rock-fill dam     high concrete dam     construction quality     construction schedule     real-time monitoring    

Development and application of the real-time monitoring system for filling construction process of high

Cui Bo,Hu Lianxing,Liu Donghai

Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 12,   Pages 91-96

Abstract: process, with the characteristics of real-time, high precision, automation and all weather, is developedThe monitoring system is applied in the construction field of the highest earth rock-fill dam in Asia, Nuozhadu core rock-fill dam, as the core component of the construction process control architecture, achieving refining, all-whether and real-time control on key links of dam filling construction, whichimproves quality control level and efficiency of construction process.

Keywords: high core rock-fill dam     filling construction process     real-time monitoring     transportation to dam     rolling    

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Strategic Study of Chinese Academy of Engineering 2011, Volume 13, Issue 12,   Pages 97-102

Abstract: therefore, the internal and external environment and constraint condition are changed in the actual construction, leading to the deviation between formerly construction schedule plan and actual construction scheduleIf the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based onThe feasibility study and scientific basis is provided for the real-time control of construction schedule

Keywords: long diversion tunnel     construction schedule     real-time control     visual     simulation    

Performance of seven highway construction contracting methods analyzed by project size

Yuanxin ZHANG, Abdol CHINI, R. Edward MINCHIN Jr., Lourdes PTSCHELINZEW, Dev SHAH

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 240-250 doi: 10.15302/J-FEM-2018040

Abstract: The conventional Design-Bid-Build (DBB) construction contracting method has had various drawbacks exposedin highway construction practice, including lack of communication, inefficient design, antagonizing

Keywords: alternative contracting methods     time     cost     performance evaluation    

Research on the Development Strategy of Real-time and Intelligent Space-Based Information Service System

Li Deren , Shen Xin

Strategic Study of Chinese Academy of Engineering 2020, Volume 22, Issue 2,   Pages 138-143 doi: 10.15302/J-SSCAE-2020.02.017

Abstract:

Real-time and intelligent space-based information service system is aIt delivers space-based information to civil and military users as required in real time, relying onMoreover, it expounds the basic concept, objectives, and technical architecture of the real-time andand the existing (or planned) space-based information system, thus demonstrating its feasibility for constructionDuring the construction of this system, communicating and integration with existing and planned communications

Keywords: space-based information     real-time intelligent service     system construction     technical architecture     strategic    

Tracking of safety hazards and real-time-prediction model of safety risks on construction sites

Wu Weiwei,Patrick T. I. LAM,Li Qiming,Michael C. H. YAM,David A. S. CHEW

Strategic Study of Chinese Academy of Engineering 2010, Volume 12, Issue 3,   Pages 68-72

Abstract: ="text-align: justify;">This paper aims to explore the tracking approach of safety hazards and real-time-predictionmethods of safety risks on construction sites.A literature review of safety issues on construction sites is first conducted.Consequently, a schematic model of tracking safety hazards and real-time prediction of safety risks isThis study would provide a possible research approach on method for tracking safety hazards and real-time

Keywords: construction sites     safety risks     real-time prediction     precursor signals     signal detection theory    

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting Mobile Antiship Missile

Hu Ronglin,Li Xingguo

Strategic Study of Chinese Academy of Engineering 2007, Volume 9, Issue 6,   Pages 48-52

Abstract:

The methodology of visual simulation for tunnel engineering construction Visualization of founding model,  calculation and result of construction schedule simulation The simulate model of tunnel engineering construction schedule is founded. Risk analysis and decision_making method of tunnel engineering construction schedule based on visualschedule S curve real time management and control method based on visual simulation are presented.

Keywords: visual simulation     tunnel construction     optimization analysis     real time control    

Research on Financing Risk and Its Control in Large-scale Public Project

Chen Shouke and Wei Zhuobin

Strategic Study of Chinese Academy of Engineering 2007, Volume 9, Issue 12,   Pages 57-62

Abstract: paper discussed the financing risk of large public project operation from three aspects: finance scale, constructiontime and return on the investment.

Keywords: largescale public project     financing risk     finance scale     construction time     return on the investment    

General expression for linear and nonlinear time series models

Ren HUANG, Feiyun XU, Ruwen CHEN

Frontiers of Mechanical Engineering 2009, Volume 4, Issue 1,   Pages 15-24 doi: 10.1007/s11465-009-0015-z

Abstract: The typical time series models such as ARMA, AR, and MA are founded on the normality and stationarityThis paper proposes a general expression for linear and nonlinear auto-regressive time series modelsThe modeling and prediction accuracy of the GNAR model is superior to the classical time series models

Keywords: linear and nonlinear     autoregressive model     system identification     time series analysis    

The Backdrop and Significance of Ecological Civilization Construction

Du Xiangwan,Wen Zongguo,Wang Ning2, and Cao Xin

Strategic Study of Chinese Academy of Engineering 2015, Volume 17, Issue 8,   Pages 8-15

Abstract:

Ecological civilization is a new stage of human civilization. It is a more complex, more progressive and more advanced mode, accompanying the development of human society. In China, the promulgation of ecological civilization has been promoted to the level of national development strategies and has been gradually put into practice. From the perspective of the relationship between man and nature, the paper is started by analyzing the evolution process of human civilization, underlying that ecological civilization is a new form preceding the primitive civilization, agricultural civilization and industrial civilization. Furthermore, the paper explains the international and domestic backdrop for promoting ecological civilization in China. Based on the changes of the national development concepts since the foundation of a new China, this paper interprets the five opportunities for promoting ecological civilization in China. Finally, the paper proposes strategic recommendations based on the current situation, in order to provide reference for ecological civilization theory and practice in China.

Keywords: ecological civilization     time background     civilization evolution     significance     strategic recommendation    

Run-time system based on LinSERCANS and Soft-PLC

Cunfeng KANG, Chong WANG, Chunmin MA, Xudong HUANG, Renyuan FEI

Frontiers of Mechanical Engineering 2009, Volume 4, Issue 2,   Pages 120-124 doi: 10.1007/s11465-009-0019-8

Abstract: It is able to combine LinSERCANS with the Soft-PLC, and a run-time system is developed based on the interfacetechnology of the serial real-time communication system (SERCOS) and technology of soft-PLC.This run-time system has been used in all electronic injection molding machines and works very well.

Keywords: Soft-PLC     run-time system     LinSERCANS     dynamic link libraries    

Title Author Date Type Operation

Analyzing construction safety through time series methods

Houchen CAO, Yang Miang GOH

Journal Article

Key uncertainty events impacting on the completion time of highway construction projects

Alireza MOGHAYEDI, Abimbola WINDAPO

Journal Article

Negative weights in network time model

Zoltán A. VATTAI, Levente MÁLYUSZ

Journal Article

Theory and application of system integration in real-time control on high arch dam construction

Ren Bingyu,Wu Binping

Journal Article

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Journal Article

Development and application of the real-time monitoring system for filling construction process of high

Cui Bo,Hu Lianxing,Liu Donghai

Journal Article

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Journal Article

Performance of seven highway construction contracting methods analyzed by project size

Yuanxin ZHANG, Abdol CHINI, R. Edward MINCHIN Jr., Lourdes PTSCHELINZEW, Dev SHAH

Journal Article

Research on the Development Strategy of Real-time and Intelligent Space-Based Information Service System

Li Deren , Shen Xin

Journal Article

Tracking of safety hazards and real-time-prediction model of safety risks on construction sites

Wu Weiwei,Patrick T. I. LAM,Li Qiming,Michael C. H. YAM,David A. S. CHEW

Journal Article

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting Mobile Antiship Missile

Hu Ronglin,Li Xingguo

Journal Article

Research on Financing Risk and Its Control in Large-scale Public Project

Chen Shouke and Wei Zhuobin

Journal Article

General expression for linear and nonlinear time series models

Ren HUANG, Feiyun XU, Ruwen CHEN

Journal Article

The Backdrop and Significance of Ecological Civilization Construction

Du Xiangwan,Wen Zongguo,Wang Ning2, and Cao Xin

Journal Article

Run-time system based on LinSERCANS and Soft-PLC

Cunfeng KANG, Chong WANG, Chunmin MA, Xudong HUANG, Renyuan FEI

Journal Article