Search scope:
排序: Display mode:
Hefu Pu, Aamir Khan Mastoi, Xunlong Chen, Dingbao Song, Jinwei Qiu, Peng Yang
Frontiers of Environmental Science & Engineering 2021, Volume 15, Issue 4, doi: 10.1007/s11783-020-1359-1
Keywords: Dredged contaminated sediment Dewatering Solidification/stabilization Vacuum preloading Prefabricated
Possible solutions for sludge dewatering in China
Wei WANG, Yuxiang LUO, Wei QIAO,
Frontiers of Environmental Science & Engineering 2010, Volume 4, Issue 1, Pages 102-107 doi: 10.1007/s11783-010-0001-z
Keywords: sewage sludge disposal water content thermal drying hydrothermal conditioning
Yuning YANG,Huan LI
Frontiers of Environmental Science & Engineering 2016, Volume 10, Issue 3, Pages 578-584 doi: 10.1007/s11783-015-0827-5
Keywords: sewage sludge humic substances recovery phosphorus fertilizer
Guangyin ZHEN, Xueqin LU, Baoying WANG, Youcai ZHAO, Xiaoli CHAI, Dongjie NIU, Tiantao ZHAO
Frontiers of Environmental Science & Engineering 2014, Volume 8, Issue 2, Pages 267-276 doi: 10.1007/s11783-013-0530-3
Keywords: Fenton pretreatment response surface methodology (RSM) capillary suction time (CST) dewaterabilty molecular weight distribution
Jianwei Liu, Kaixiong Yang, Lin Li, Jingying Zhang
Frontiers of Environmental Science & Engineering 2017, Volume 11, Issue 4, doi: 10.1007/s11783-017-0932-8
Keywords: Biological deodorization Microbial characteristics Ammonia Hydrogen sulfide Wastewater treatment plant
Marco Malaguti,Lorenzo Craveri,Francesco Ricceri,Vincenzo Riggio,Mariachiara Zanetti,Alberto Tiraferri,
Engineering doi: 10.1016/j.eng.2023.07.010
Keywords: Scenedesmus obliquus Microfiltration Permeate reuse Harvesting Microalgae Pilot-scale
Construction technology in huge caisson on the ground
Qiu Qionghai,Lin Fan,Jiang Jianghua
Strategic Study of CAE 2010, Volume 12, Issue 4, Pages 14-20
Taizhou Changjiang River Highway Bridge is a suspension bridge with three towers, two spans and two anchorages. The main span is 2×1 080 m. The south and north foundation of the anchorages are deep water caisson with rectangular plane size 67.9 m×52.0 m. A great many of technical innovations are adopted to solve many technical problems including the disposal of the compound basement, manufacturing and installation of the caisson, fulfillment of concrete in the caisson etc, based on the conditions such as the thick overburden layer at the top of the caisson, the super dimension and the big sinking depth of the caisson. This article gives a brief introduction on construction technologies in huge caisson on the ground and can be taken as a reference during the construction of the super scale caisson on the ground in the future.
Keywords: suspension bridge anchorage caisson assembly deep-well dewatering foundation settlement air suction
Title Author Date Type Operation
An integrated method for the rapid dewatering and solidification/stabilization of dredged contaminated
Hefu Pu, Aamir Khan Mastoi, Xunlong Chen, Dingbao Song, Jinwei Qiu, Peng Yang
Journal Article
Recovering humic substances from the dewatering effluent of thermally treated sludge and its performance
Yuning YANG,Huan LI
Journal Article
Enhanced dewatering characteristics of waste activated sludge with Fenton pretreatment: effectiveness
Guangyin ZHEN, Xueqin LU, Baoying WANG, Youcai ZHAO, Xiaoli CHAI, Dongjie NIU, Tiantao ZHAO
Journal Article
A full-scale integrated-bioreactor with two zones treating odours from sludge thickening tank and dewatering
Jianwei Liu, Kaixiong Yang, Lin Li, Jingying Zhang
Journal Article
Dewatering of Scenedesmus Obliquus Cultivation Substrate with Microfiltration: Potential and Challenges
Marco Malaguti,Lorenzo Craveri,Francesco Ricceri,Vincenzo Riggio,Mariachiara Zanetti,Alberto Tiraferri,
Journal Article