Resource Type

Journal Article 5

Conference Videos 1

Year

2021 2

2020 3

2016 1

Keywords

assessment method 2

strategic emerging industries 2

Expo 1

building information modeling 1

construction consulting services 1

emerging industry 1

energy conservation and environment protection 1

green and low-carbon 1

implementation barriers 1

industrial maturity levels 1

industrial system maturity level 1

industry maturity level 1

industry security and controllability level (ISCL) 1

maturity 1

new energy technology 1

new energy vehicle 1

non-process factors 1

organizational levels 1

project management maturity model 1

open ︾

Search scope:

排序: Display mode:

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 384-395 doi: 10.1007/s42524-019-0070-z

Abstract: For many years, project management maturity models (PMMM) derived from the software industry have brought

Keywords: construction consulting services     project management maturity model     non-process factors     Expo    

Evaluation Method for the Maturity Levels of Green and Low-Carbon Emerging Industries

Sun Xudong, Li Xuesong, Zhang Bo, Peng Suping

Strategic Study of CAE 2020, Volume 22, Issue 2,   Pages 98-107 doi: 10.15302/J-SSCAE-2020.02.014

Abstract: Therefore, research on the corresponding maturity evaluation method is urgently needed.This study first summarizes the basic theory and general method for industry maturity evaluation, thenMeanwhile, the maturity evaluation model and index system of the green and low-carbon industries areproposed and the calculation method of the industry maturity levels is presented.Moreover, application of the maturity evaluation method of the green and lowcarbon industries is studied

Keywords: green and low-carbon     emerging industry     industry maturity level     new energy technology     energy conservation    

Assessment Method of Industrial System Maturity Levels

Wang Liheng, Zhou Zhicheng, Wang Kunsheng, Lu Chunhua, Wang Hainan, Cui Jian, Ma Xuemei

Strategic Study of CAE 2020, Volume 22, Issue 2,   Pages 91-97 doi: 10.15302/J-SSCAE-2020.02.013

Abstract:

This paper proposes the concept of industrial system maturity level,China’s strategic emerging industries, this study assessed and analyzed the industrial system maturity

Keywords: industrial system maturity level     strategic emerging industries     assessment method     industry security and    

Assessment of Industrial Maturity Levels: Research and Practice

Wang Liheng, Tu Hailing, Wang Kunsheng, Yuan Jianhua, Ge Hongzhi, Hu Liangyuan, Wang Hainan, Zhao Yan, Lu Yue, Cui Jian

Strategic Study of CAE 2016, Volume 18, Issue 4,   Pages 9-17 doi: 10.15302/J-SSCAE-2016.04.002

Abstract: follows an objective cyclical law that is an inevitable progression from technological and manufacturing maturityindustries combined with system engineering and data decision making, this thesis uses the industrial maturityChina’s strategic emerging industry in the 13th Five-Year Plan as an example of using industrial maturity

Keywords: industrial maturity levels     strategic emerging industries     assessment method    

Understanding barriers to BIM implementation: Their impact across organizational levels in relation to BIM maturity

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

Frontiers of Engineering Management 2021, Volume 8, Issue 2,   Pages 236-257 doi: 10.1007/s42524-019-0088-2

Abstract: ., from top management to project teams) and by relating these barriers to different degrees of BIM maturityThird, only those cases with a low level of BIM maturity have struggled with lack of top management support, thereby highlighting the importance of such support in achieving BIM maturity growth.High BIM maturity situations are more prone to externally oriented barriers in attempting to furtherprovides insights on where to focus BIM implementation measures and how to enhance organizational BIM maturity

Keywords: building information modeling     implementation barriers     maturity     organizational levels    

Title Author Date Type Operation

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Journal Article

Evaluation Method for the Maturity Levels of Green and Low-Carbon Emerging Industries

Sun Xudong, Li Xuesong, Zhang Bo, Peng Suping

Journal Article

Assessment Method of Industrial System Maturity Levels

Wang Liheng, Zhou Zhicheng, Wang Kunsheng, Lu Chunhua, Wang Hainan, Cui Jian, Ma Xuemei

Journal Article

Assessment of Industrial Maturity Levels: Research and Practice

Wang Liheng, Tu Hailing, Wang Kunsheng, Yuan Jianhua, Ge Hongzhi, Hu Liangyuan, Wang Hainan, Zhao Yan, Lu Yue, Cui Jian

Journal Article

Understanding barriers to BIM implementation: Their impact across organizational levels in relation to BIM maturity

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

Journal Article

Wei Yang: Internet of Things Maturity Index ( IDEX ) - IOT Michelin: Best Practices (2021-8-19)

17 Oct 2021

Conference Videos