Resource Type

Journal Article 587

Conference Videos 15

Year

2024 2

2023 44

2022 62

2021 49

2020 41

2019 30

2018 38

2017 24

2016 24

2015 30

2014 30

2013 28

2012 30

2011 22

2010 34

2009 13

2008 17

2007 23

2006 8

2005 12

open ︾

Keywords

evaluation 17

risk analysis 14

risk assessment 14

performance evaluation 11

risk management 11

Risk assessment 10

risk 10

risk factors 8

COVID-19 7

China 4

evaluation system 4

fuzzy comprehensive evaluation 4

index system 4

quality evaluation 4

risk factor 4

comprehensive evaluation 3

construction project 3

safety 3

Antibiotic resistance genes 2

open ︾

Search scope:

排序: Display mode:

Aerosol exposure assessment during reclaimed water utilization in China and risk evaluation in case of

Frontiers of Environmental Science & Engineering 2022, Volume 16, Issue 7, doi: 10.1007/s11783-021-1516-1

Abstract:

• The Chinese population exposure habits were surveyed.

Keywords: Legionella     QMRA     Reclaimed water     Aerosol     Water reuse    

The Application of Risk Matrix to Acquisition Risk Evaluation for Weapon and Equipment

Li Zhongmin,Wei Yiming,Tang Shuchun,Chen Jian

Strategic Study of CAE 2006, Volume 8, Issue 6,   Pages 95-99

Abstract:

Risk evaluation is the basis of acquisition management for weapon and equipment.the application of risk matrix in acquisition risk evaluation for weapon and equipment in China.Then, the paper, beginning with the two rules of risk impact and risk probability, demonstrates riskevaluation of a type of weapon and equipment as a case study, thus lays a basis for the scientific andrational risk management decision making.

Keywords: risk matrix     risk evaluation     acquisition for weapon and equipment    

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 251-267 doi: 10.15302/J-FEM-2018086

Abstract: In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properlyAlthough several studies have been focused on the various effects of risk in construction projects, limitedefforts have been made to investigate the typical and the overall schedule delay risk.the multiple-criteria decision-making (MCDM) model of fuzzy analytic hierarchy process comprehensive evaluationthe exact risk level on specific activity to make appropriate decision.

Keywords: fuzzy analytic hierarchy process comprehensive evaluation     construction project     detection of delay risk    

Risk evaluation for the task transfer of an aircraft maintenance program based on a multielement connection

Frontiers of Engineering Management doi: 10.1007/s42524-023-0282-0

Abstract: framework for evaluating the efficacy and suitability of maintenance programs with a focus on quantitative riskThe paper advances a holistic risk assessment index architecture tailored for the task transfer of maintenancecharacterize decision-specific data, thereby facilitating the quantification of task transfer-associated riskMoreover, the paper conducts a temporal risk trend analysis founded on partial connection numbers ofThis analytical construct serves to streamline the process of risk assessment pertinent to maintenance

Keywords: risk evaluation     maintenance steering group     analytic network process     task transfer     maintenance program    

A novel method for reliability and risk evaluation of wind energy conversion systems considering wind

Seyed Mohsen MIRYOUSEFI AVAL,Amir AHADI,Hosein HAYATI

Frontiers in Energy 2016, Volume 10, Issue 1,   Pages 46-56 doi: 10.1007/s11708-015-0384-4

Abstract: This paper investigates an analytical approach for the reliability modeling of doubly fed induction generator (DFIG) wind turbines. At present, to the best of the authors’ knowledge, wind speed and wind turbine generator outage have not been addressed simultaneously. In this paper, a novel methodology based on the Weibull-Markov method is proposed for evaluating the probabilistic reliability of the bulk electric power systems, including DFIG wind turbines, considering wind speed and wind turbine generator outage. The proposed model is presented in terms of appropriate wind speed modeling as well as capacity outage probability table (COPT), considering component failures of the wind turbine generators. Based on the proposed method, the COPT of the wind farm has been developed and utilized on the IEEE RBTS to estimate the well-known reliability and sensitive indices. The simulation results reveal the importance of inclusion of wind turbine generator outage as well as wind speed in the reliability assessment of the wind farms. Moreover, the proposed method reduces the complexity of using analytical methods and provides an accurate reliability model for the wind turbines. Furthermore, several case studies are considered to demonstrate the effectiveness of the proposed method in practical applications.

Keywords: doubly-fed induction generator (DFIG)     composite system adequacy assessment     wind speed correlation    

Evaluation of the relative risk of stroke in patients with hypertension using cerebrovascular hemodynamic

HUANG Jiuyi, WANG Guiqing, GUO Jiping, CAO Yifeng, WANG Yan, YANG Yongju, YU Xuehai

Frontiers of Medicine 2007, Volume 1, Issue 3,   Pages 274-278 doi: 10.1007/s11684-007-0052-0

Abstract: The relative risk (RR) of stroke in patients with hypertension was evaluated by using synthetic indexpatients with hypertension with ages ≥40 years were selected from a population-based cohort study of the riskThe data on the baseline investigation of risk factors, the determination of cerebrovascular hemodynamicThe risk of stroke in patients with hypertension is closely asso ciated with hemodynamic impairment andthe hemodynamic score may be used for quantitative evaluation of relative risks of stroke.

Keywords: inclusion     quantitative evaluation     cerebrovascular     relative     decrease    

Risk analysis methods of the water resources system under uncertainty

Zeying GUI,Chenglong ZHANG,Mo Li,Ping GUO

Frontiers of Agricultural Science and Engineering 2015, Volume 2, Issue 3,   Pages 205-215 doi: 10.15302/J-FASE-2015073

Abstract: system (WRS) is its great complexity and uncertainty, which makes it highly desirable to carry out a riskcognitive ability are possible sources of the uncertainties that need to be taken into account in the riskThen the quantitative characterization methods of risk analysis are introduced, including three criteriamodel, conditional value at risk model, chance-constrained risk model, minimizing probability of riskA more comprehensive risk analysis methodology for the WRS is proposed based on the comparison of the

Keywords: water resources system     evaluation criterion     optimization model     risk analysis method     uncertainty    

Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel

Li Da,Hong Kairong and Tan Zhongsheng

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 95-100

Abstract: risks of Bohai Strait tunnel are made by means of analytic hierarchy process (AHP) fuzzy comprehensive evaluationThe results show that the construction risk grade of Bohai Strait tunnel is grade Ⅲ.

Keywords: Bohai Strait tunnel     analytic hierarchy process     fuzzy evaluation     risk estimation     risk countermeasure    

A Fast Evaluation and Research Method for Exploration Potential of Oversea Basins

Hong-quan Kang,Yun-hua Deng,Huai-cun Jia,Tao Cheng,Bo Bai

Frontiers of Engineering Management 2016, Volume 3, Issue 4,   Pages 338-342 doi: 10.15302/J-FEM-2016052

Abstract: This paper focuses on overseas basins with different exploration degrees and offers a new evaluationsystem and research method for fast evaluation and risk analysis on hydrocarbon potential.factor with comprehensive and quantitative assignment, to accelerate geological evaluation.recognition should drive the evaluation for basins with high exploration degrees.used in oversea evaluation and decision-making objectively, scientifically and efficiently.

Keywords: geological risk analysis     probability model     evaluation factors     oversea exploration     hydrocarbon exploration    

Cohort study of patients with Stevens–Johnson syndrome and toxic epidermal necrolysis in China: evaluationof risk models and new predictor of pulmonary consolidation on computed tomography

Yanhong Shou, Lu Yang, Yongsheng Yang, Xiaohua Zhu, Feng Li, Bo Yin, Yingyan Zheng, Jinhua Xu

Frontiers of Medicine 2021, Volume 15, Issue 4,   Pages 585-593 doi: 10.1007/s11684-020-0817-2

Abstract: This study aimed to validate the predictive ability of risk models in patients with SJS/TEN and propose

Keywords: Stevens–Johnson syndrome     toxic epidermal necrolysis     auxiliary score     ABCD-10     pulmonary consolidation    

Building Fire Direct Loss Evaluation Based on Fire Dynamics and Probability Statistics Theory

Chu Guanquan,Sun Jinhua

Strategic Study of CAE 2004, Volume 6, Issue 8,   Pages 64-68

Abstract:

Based on fire growth probability and burned area, the method for evaluating burned area in building fire is presented in this paper. According to fire dynamics and different characteristics in fire growth process, the process is divided into four phases. By means of probability theory and event tree analysis, fire growth probability and critical time of every phase are calculated. Average burned area of building can be evaluated.

Keywords: building fire     fire risk evaluation     event tree     probability     burned area    

Practical evaluation for water utilities in China by using analytic hierarchy process

Hong CHEN,Feng XIAO,Zhe BI,Ping XIAO,Dongsheng WANG,Ming YANG

Frontiers of Environmental Science & Engineering 2015, Volume 9, Issue 1,   Pages 131-137 doi: 10.1007/s11783-014-0718-1

Abstract: The risk of water utilities would include the water quality failure and the water quantity failure, fromIn this paper, we proposed a practical evaluation method based on the analytic hierarchy process (AHPThe evaluation model was successfully performed by a case study.The risk management can be applied through specific software packages with a user-friendly interface,we believe this method will improve and play a more and more active role in the development of the risk

Keywords: analytic hierarchy process (AHP)     risk management     water quality failure     water quantity failure    

Fire Risk Evaluation for Historic Building of The Potala Pal ace

Zhuang Lei,Lu Shouxiang,Wang Fuliang

Strategic Study of CAE 2007, Volume 9, Issue 3,   Pages 76-81

Abstract: Fire risk evaluation described in this paper is one kind of semi-quantitative methods.It uses a model of multiple attribute evaluation to produce a measure of relative fire risk.Weights are established to indicate the importance of fire risk parameters.Fire risk is evaluated by the scalar product of the parameter weights and grades, producing a single

Keywords: the Potala Palace     historical buildings     fire risk assessment     semi-quantitative methods     firehazard    

Reliability analysis of urban gas transmission and distribution system based on FMEA and correlation operator

Su LI,Weiguo ZHOU

Frontiers in Energy 2014, Volume 8, Issue 4,   Pages 443-448 doi: 10.1007/s11708-014-0336-4

Abstract: the multi-expert decision making, the correlation operator was introduced into the calculation of the riskUsing FMEA along with weight analysis and expert investigation approach, the FMEA evaluation table wasgiven, including five failure modes, risk priority numbers, failure causes and effects, as well as corrective

Keywords: gas transmission and distribution system     risk evaluation     reliability analysis     failure mode and effects    

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Strategic Study of CAE 2015, Volume 17, Issue 1,   Pages 143-150

Abstract: re-allocation and improving resource-utilization efficiency in coping with project delay caused by riskevents,a stochastic simulation evaluation method based on duration controllability of network scheduleThrough the stochastic simulation of each risk events occur time, delay of activity duration and effectof the risk reaction,the distribution of project duration was simulated which was utilized to evaluateA case indicates that,compared with traditional simulation evaluation methods such as duration-based

Keywords: network schedule; stochastic simulation; risk reaction; duration controllability; evaluation    

Title Author Date Type Operation

Aerosol exposure assessment during reclaimed water utilization in China and risk evaluation in case of

Journal Article

The Application of Risk Matrix to Acquisition Risk Evaluation for Weapon and Equipment

Li Zhongmin,Wei Yiming,Tang Shuchun,Chen Jian

Journal Article

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Journal Article

Risk evaluation for the task transfer of an aircraft maintenance program based on a multielement connection

Journal Article

A novel method for reliability and risk evaluation of wind energy conversion systems considering wind

Seyed Mohsen MIRYOUSEFI AVAL,Amir AHADI,Hosein HAYATI

Journal Article

Evaluation of the relative risk of stroke in patients with hypertension using cerebrovascular hemodynamic

HUANG Jiuyi, WANG Guiqing, GUO Jiping, CAO Yifeng, WANG Yan, YANG Yongju, YU Xuehai

Journal Article

Risk analysis methods of the water resources system under uncertainty

Zeying GUI,Chenglong ZHANG,Mo Li,Ping GUO

Journal Article

Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel

Li Da,Hong Kairong and Tan Zhongsheng

Journal Article

A Fast Evaluation and Research Method for Exploration Potential of Oversea Basins

Hong-quan Kang,Yun-hua Deng,Huai-cun Jia,Tao Cheng,Bo Bai

Journal Article

Cohort study of patients with Stevens–Johnson syndrome and toxic epidermal necrolysis in China: evaluationof risk models and new predictor of pulmonary consolidation on computed tomography

Yanhong Shou, Lu Yang, Yongsheng Yang, Xiaohua Zhu, Feng Li, Bo Yin, Yingyan Zheng, Jinhua Xu

Journal Article

Building Fire Direct Loss Evaluation Based on Fire Dynamics and Probability Statistics Theory

Chu Guanquan,Sun Jinhua

Journal Article

Practical evaluation for water utilities in China by using analytic hierarchy process

Hong CHEN,Feng XIAO,Zhe BI,Ping XIAO,Dongsheng WANG,Ming YANG

Journal Article

Fire Risk Evaluation for Historic Building of The Potala Pal ace

Zhuang Lei,Lu Shouxiang,Wang Fuliang

Journal Article

Reliability analysis of urban gas transmission and distribution system based on FMEA and correlation operator

Su LI,Weiguo ZHOU

Journal Article

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Journal Article