期刊首页 优先出版 当期阅读 过刊浏览 作者中心 关于期刊 English

《结构与土木工程前沿(英文)》 >> 2021年 第15卷 第1期 doi: 10.1007/s11709-020-0710-8

Stability analysis and optimization of excavation method of double-arch tunnel with an extra-large span based on numerical investigation

Geotechnical and Structural Engineering Research Center, Shandong University, Jinan 250061, China

收稿日期: 2020-12-31 录用日期: 2021-03-05 发布日期: 2021-03-05

下一篇 上一篇

摘要

The Xiamen Haicang double-arch tunnel has a maximum span of 45.73 m and a minimum burial depth of 5.8 m. A larger deformation or collapse of the tunnel is readily encountered during tunnel excavation. It is therefore necessary to select a construction approach that is suitable for double-arch tunnel projects with an extra-large span. In this study, three construction methods for double-arch tunnels with extra-large spans were numerically simulated. Subsequently, the deformation behavior and stress characteristics of the surrounding rock were obtained and compared. The results showed that the double-side-drift method with temporary vertical support achieves better adaptability in the construction of such tunnels, which can be observed from both the numerical results and monitoring data. In addition, the improved temporary support plays a critical role in controlling the surrounding rock deformation. In addition, the disturbance resulting from the excavation of adjacent drifts was obvious, particularly the disturbance of the surrounding rock caused by the excavation of the middle drift. The present findings can serve as the initial guidelines for the construction of ultra-shallowly buried double-arch tunnels with extra-large spans.

相关研究