期刊首页 优先出版 当期阅读 过刊浏览 作者中心 关于期刊 English

《环境科学与工程前沿(英文)》 >> 2015年 第9卷 第6期 doi: 10.1007/s11783-015-0804-z

Combination of the direct electro-Fenton process and bioremediation for the treatment of pyrene-contaminated soil in a slurry reactor

1. Institute of Applied Ecology, Chinese Academy of Sciences, Shenyang 110016, China.2. University of Chinese Academy of Sciences, Beijing 100049, China

录用日期: 2015-07-17 发布日期: 2015-11-23

下一篇 上一篇

摘要

A combined treatment technology (DEF-BIO) using the direct electro-Fenton (DEF) process and bioremediation (BIO) was established in this study. The performance of the DEF-BIO process on the remediation of a pyrene (PYR)-contaminated soil was evaluated in a slurry reactor. The appropriate order of application was to conduct the DEF process followed by BIO, evaluated through analysis of the degradation characteristics of each process individually. In addition, the application time of the DEF process affected the efficiency of the combined process. The optimum time to apply the DEF process was determined through an analysis of the induced changes in PYR intermediates, pH, soil organic matter (SOM) and bacteria. The optimum application time of the DEF process was 6 h. All the induced changes were beneficial for the BIO phase. The removal of PYR was 91.02% for DEF–BIO after 72 h, and the efficiency was almost 50% increased, compared with the individual DEF and BIO treatments. Therefore, the combined process of DEF–BIO process may be an efficient and promising method for the remediation.

相关研究