Requirements in performance measurement systems of construction projects from the lean production perspective

Building Innovation Research Unit (NORIE), Universidade Federal do Rio Grande do Sul, Porto Alegre 90040-060, Brazil

收稿日期: 2020-04-09 录用日期: 2020-05-21 发布日期: 2020-05-21

下一篇 上一篇

摘要

Performance measurement (PM) generates useful data for process control, facilitates communication between different sectors, and helps to align efforts on the most important aspects of the business. Thus, PM plays a key role in the management of projects and organizations. PM is also important in the implementation of lean production principles and methods, such as reducing the share of nonvalue-adding activities, increasing process transparency, building continuous improvement into the process, and benchmarking. Moreover, the adoption of the lean production philosophy requires changes in PM. Despite its importance, limited studies have been conducted on the use of PM systems for assessing the impact of lean production programs in construction projects. In addition, studies on how lean companies (or projects) use performance measurement and to what extent the indicators adopted reflect the result of actions that have been undertaken are limited. This study proposes a set of requirements in PM systems of construction projects from the perspective of lean production and a taxonomy of performance metrics for lean production systems. Five empirical studies have been carried out on construction companies from South America involved in the implementation of lean production systems. The scope of this investigation is limited to the construction projects as production systems rather than PM at the level of construction organizations.

相关研究