三峡工程水工建筑物关键技术

Changjiang Institute of Survey, Planning, Design and Research, Wuhan 430010, China

发布日期: 2016-09-26

下一篇 上一篇

摘要

三峡工程是治理和开发长江的关键性骨干工程,是当今世界最大的水利枢纽工程。其工程规模和综合效益巨大,工程技术复杂,设计难度超出了世界已建水利水电工程,在工程设计研究过程中提出并运用了一系列新的设计理论和方法,攻克了多层大孔口泄水重力坝、巨型机组水电站、高水头大型连续多级船闸等重要水工建筑物的多项关键技术难题。

图片

图1

图2

图3

图4

图5

图6

图7

图8

图9

参考文献

[ 1 ] Zheng S. Summarization on main technical issues in Three Gorges Project design of the Yangtze River. Yangtze River 2003;34(8):4–11. Chinese.

[ 2 ] Zheng S, Niu X. The research and practice of key technological issues in structure design of Three Gorges Project. Eng Sci 2011;13(7):20–7. Chinese.

[ 3 ] Niu X, Wang X, Chen H. Design on the general layout of Three Gorges project. J Hydroelectric Eng 2009;28(6):13–8. Chinese.

[ 4 ] Niu X. Technology practice summary of the Three Gorges high gravity dam. Adv Water Sci 2013;24(3):442–8. Chinese.

[ 5 ] Liao R, Kong F, Wu X. Flood discharge and energy dissipation technology of Three Gorges Project. Yangtze River 1997;28(10):13–5. Chinese.

[ 6 ] Zhen S, Liu N. Major technical problems on design of TGP dam and powerhouses. Yangtze River 1997;28(10):3–6. Chinese.

[ 7 ] Darwin D, Pecknold DAW. Nonlinear biaxial stress-strain law for concrete. J Eng Mech-ASCE 1977;103(EM2):229–41.

[ 8 ] Wang J, Zhang X. Calculation principle for finite element design for hydraulic reinforced concrete structures. Adv Sci Technol Water Resour 2005;25(5):44–7. Chinese.

[ 9 ] Du J, Hu J. Stress analysis and reinforcement design on the outlet of deep hole in TGP. Large Dam Safe 2004;(4):81–3. Chinese.

[10] Design code for hydraulic concrete structures, SL?191-2008 (2008). Chinese.

[11] Zhou S, Xie H. The design of Three Gorges Hydropower Station. Eng Sci 2011;9(3):66–73.

[12] Design specification for steel penstocks of hydroelectric stations, SL?281-2003 (2003). Chinese.

[13] Xie H, Zhou S, Hu J. Design and research on some technological issues for structures of TGP Hydropower Station. Yangtze River 2010;41(4):81–3. Chinese.

[14] Yang J, Chen J, Chen W, Li S. Study on the configuration of hydropower station tailrace tunnel with sloping ceiling. J Hydraulic Eng 1998;(3):9–12.

[15] Niu X, Yang J, Xie H, Wang H. Design and application of inclined roof tailrace tunnel in underground power station of TGP. Yangtze River 2009;40(23):1–4. Chinese.

[16] Niu X, Ding X. Bearing mechanism of top arch and stable arch design method for surrounding rock of underground caverns. Chinese J Rock Mech Eng 2013;32(4):775–86. Chinese.

[17] Zheng S, Niu X, Song W, Tong D. Impacts of the Three Gorges Project ship lock on the innovation and development of the water science in the world. China Water Resour 2004;(22):25–7. Chinese.

[18] Jiang X, Yao Y. Research on key hydraulic techniques of Three Gorges Shiplock and examining in practice. Hubei Water Power 2007;(5):55–9,78. Chinese.

[19] Dai H, Zhu H. Study on hydraulic of convey water system in TGP 5-step ship lock of Three Gorges. Water Power 2005;31(7):28–31. Chinese.

[20] Hu Y, Zhang R, Zheng C. Study on depression measures against lip cavitation of reversed tainter valves. Hydro Sci Eng 1994;(Z1):71–9. Chinese.

[21] Niu X, Jiang X. Experimental feedback on the investigation of hydraulic characteristics for the ship-lock filling and emptying system of TGP. J Hydrodyn 2005;17(6):770–5.

[22] Hu Y, Zhang R, Li Y. Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the finishing construction period. Eng Sci 2009;11(9):52–8. Chinese.

[23] Niu X. Innovation and new challenges of hydropower technology in China. Yangtze River 2015;46(19):13–17. Chinese.

[24] Niu X. Full lining ship lock design. Wuhan: Changjiang Press; 2011. Chinese.

[25] Niu X. Design and study on hydraulic structure of permanent ship lock of Three Gorges Project. Yangtze River 1997;28(10):7–9. Chinese.

相关研究