摘要
本文总结了中国水利水电工程的发展,并与国外的情况进行了比较,对高坝建设安全保障、江河治理与非均匀不平衡输沙理论、跨流域调水工程、巨型水电机组、抽水蓄能电站、地下洞室以及生态保护等方面的重大技术进展进行了阐述。
参考文献
[ 1 ] Jia J, editor. Dam construction in China—a sixty-year review.Beijing: China Water & Power Press; 2015.
[ 2 ] Jia J, Li N, Xu Z, Li G, Hao J, Mi Z, . Study on key technology for the safety of high CFRDs.Beijing: China Water & Power Press; 2014. Chinese.
[ 3 ] Ma H, Chi F. Major technologies for safe construction of high earth-rockfill dams. Engineering 2016;2(4). Accepted.
[ 4 ] Niu X. Key technology of the hydraulic structures of the Three Gorges Project. Engineering 2016;2(3). In press 链接1
[ 5 ] Wang R. Key technologies and practices in the construction of ultra-high arch dams of 300?m level. Engineering 2016;2(3). In press 链接1
[ 6 ] Chen H. Anti-seismic research for high concrete dams.Beijing: Higher Education Press; 2011. Chinese.
[ 7 ] Xie S, Wu Y, Chen W. New technology and innovation on flood discharge and energy dissipation of high dams in China. J Hydraul Eng 2016,47(3):324–36. Chinese.
[ 8 ] Liu Z, Zhang D, Zhang H, Wu Y. Hydraulic characteristics of converse curvature section and aerator in high-head and large discharge spillway tunnel. Sci China Technol Sc 2011;54(Suppl 1):33–9.
[ 9 ] Hu C, An C, Chen J, Chen X. Optimum allocation of sediment in the Yellow River. Beijing: Science Press; 2012. Chinese 链接1
[10] Han Q. Non-equilibrium transport of non-uniform suspended load.Beijing: Science Press; 2013. Chinese.
[11] Liu Z, Wu Y, Chen W. Study on key hydraulic issues for the Middle Route Project of South-to-North Water Diversion.Beijing: China Water & Power Press; 2010. Chinese.
[12] Wang H, Su Z, Xie X, Xie W, Xu H. Theory and practice on river basin ecological dispatchment.Beijing: China Water & Power Press; 2010. Chinese.