期刊首页 优先出版 当期阅读 过刊浏览 作者中心 关于期刊 English

《工程(英文)》 >> 2021年 第7卷 第11期 doi: 10.1016/j.eng.2021.10.004

东方超环托卡马克

Institute of Plasma Physics, Chinese Academy of Science, Hefei 230031, China

收稿日期: 2021-03-17 修回日期: 2021-04-26 录用日期: 2021-06-16 发布日期: 2021-07-30

下一篇 上一篇

关键词

工程成就

图片

图1

图2

图3

图4

图5

图6

图7

参考文献

[ 1 ] Wesson J. Tokamaks. 4th ed. Oxford: Oxford Science Publications; 2011. 链接1

[ 2 ] Keilhacker M, Gibson A, Gormezano C, Lomas PJ, Thomas PR, Watkins ML, et al. High fusion performance from deuterium-tritium plasmas in JET. Nucl Fusion 1999;39(2):209–34. 链接1

[ 3 ] Oyama N, Isayama A, Matsunaga G, Suzuki T, Takenaga H, Sakamoto Y, et al. Long-pulse hybrid scenario development in JT-60U. Nucl Fusion 2009;49(6): 065026. 链接1

[ 4 ] Wan Y; HT-7 Team, HT-7U Team. Overview of steady state operation of HT-7 and present status of the HT-7U project. Nucl Fusion 2000;40(6):1057–68. 链接1

[ 5 ] Li J, Guo HY, Wan BN, Gong XZ, Liang YF, Xu GS, et al. A long-pulse highconfinement plasma regime in the Experimental Advanced Superconducting Tokamak. Nat Phys 2013;9(12):817–21. 链接1

[ 6 ] Loarte A, Lipschultz B, Kukushkin AS, Matthews GF, Stangeby PC, Asakura N, et al. Power and particle control. Nucl Fusion 2003;47(6):S203. 链接1

[ 7 ] Wei J, Chen WG, Wu WY, Pan YN, Gao DM, Wu ST, et al. The superconducting magnets for EAST Tokamak. IEEE T Appl Supercon 2010;20(3):556–9. 链接1

[ 8 ] Zhao YP, Zhang XJ, Mao YZ, Yuan S, Xue DY, Deng X, et al. EAST ion cyclotron resonance heating system for long pulse operation. Fusion Eng Des 2014; 89(11):2642–6. 链接1

[ 9 ] Hu C, Xie Y, Xie Y, Liu S, Xu Y, Liang L, et al. Overview of development status for EAST-NBI system. Plasma Sci Technol 2015;17(10):817–25. 链接1

[10] Wang X, Liu F, Shan J, Xu H, Wu D, Li B, et al. Progress of high power and long pulse ECRH system in EAST. Fusion Eng Des 2015;96-97:181–6. 链接1

[11] Zhang XM, Yu LM, Wan BN, Xue EB, Fang Y, Shi KY. Estimation of the current driven by residual loop voltage in LHCD plasma on EAST Tokamak. Plasma Phys Control Fusion 2016;58(2):025002. 链接1

[12] Hawryluk RJ. Results from deuterium-tritium tokamak confinement experiments. Rev Mod Phys 1998;70(2):537–87. 链接1

[13] Missirlian M, Bucalossi J, Corre Y, Ferlay F, Firdaouss M, Garin P, et al. The WEST project: current status of the ITER-like tungsten divertor. Fusion Eng Des 2014;89(7–8):1048–53. 链接1

[14] Liu FK, Li JG, Shan JF, Wang M, Liu L, Zhao LM, et al. Development of 4.6 GHz lower hybrid current drive system for steady state and high performance plasma in EAST. Fusion Eng Des 2016;113:131–8. 链接1

[15] Schlosser J, Chappuis P, Chatelier M, Durocher A, Guilheim D, Lipa M, et al. Design, fabrication and testing of an improved high heat flux element, experience feedback on steady state plasma facing components in Tore Supra. Fusion Eng Des 1998;39–40:235–40. 链接1

[16] Shi B, Yang ZD, Zhang B, Yang C, Gan KF, Chen MW, et al. Heat flux on EAST divertor plate in H-mode with LHCD/LHCD+NBI. Chin Phys Lett 2017;34(9):095201. 链接1

[17] Huber A, Arakcheev A, Sergienko G, Steudel I, Wirtz M, Burdakov AV, et al. Investigation of the impact of transient heat loads applied by laser irradiation on ITER-grade tungsten. Phys Scr 2014;2014(T159):014005. 链接1

[18] Li Q, Qin S, Wang W, Qi P, Roccella S, Visca E, et al. Manufacturing and testing of W/Cu mono-block small scale mock-up for EAST by HIP and HRP technologies. Fusion Eng Des 2013;88(9–10):1808–12. 链接1

[19] Mou N, Han L, Yao D, Pan Z, Li L, Cao L, et al. Manufacturing and high heat flux testing of flat-type W/Cu/CuCrZr mock-up by HIP assisted brazing process. Fusion Eng Des 2021;169:112670. 链接1

相关研究