正文
《能源前沿(英文)》 >> 2013年 第7卷 第2期 doi: 10.1007/s11708-013-0256-8
Integrated transmission and generation planning model in a deregulated environment
Industrial and Systems Engineering Division, Mechanical Engineering Department, University of Minnesota, Minneapolis, MN 55455, USA
摘要
正文