正文
《结构与土木工程前沿(英文)》 >> 2008年 第2卷 第4期 doi: 10.1007/s11709-008-0051-5
Experimental study on working parameters of earth pressure balance shield machine tunneling in soft ground
1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University; 2.Department of Civil Engineering, University of Shanghai for Science and Technology;
摘要
关键词
construction ; different ; coastal ; conveyor ; excavation
正文