正文
《结构与土木工程前沿(英文)》 >> 2019年 第13卷 第6期 doi: 10.1007/s11709-019-0563-1
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study
. State Key Laboratory for Geo-mechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116, China.. School of Civil and Transportation Engineering, Hebei University of Technology, Tianjin 300401, China.. Geotechnical & Structural Engineering Research Center, Shandong University, Jinan 250061, China
摘要
正文