《工程管理前沿(英文)》 >> 2020年 第7卷 第3期 doi: 10.1007/s42524-020-0100-x
Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
. Industrial Engineering Department, University of Arkansas, Fayetteville, AR 72701, USA.. Industrial Engineering Department, Sabanci University, Istanbul, Turkey
摘要
关键词
backward–forward scheduling ; hybrid bi-objective genetic algorithm ; injection procedure ; maximum cash balance ; multi-objective multi-project multi-mode resource-constrained project scheduling problem