资源类型

期刊论文 1

年份

2020 1

关键词

检索范围:

排序: 展示方式:

Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: a proof of concept study

Jordan DAVIDSON, John FOWLER, Charalampos PANTAZIS, Massimo SANNINO, Jordan WALKER, Moslem SHEIKHKHOSHKAR, Farzad Pour RAHIMIAN

《工程管理前沿(英文)》 2020年 第7卷 第3期   页码 396-403 doi: 10.1007/s42524-019-0039-y

摘要: As building practices change, procedures that seemed indispensable at one point can be abandoned for others, one example of which is the bill of quantities (B/Q). Research into the extant literature attributes the declining use of B/Qs to a multitude of reasons, such as its complexity, the potentially long time required to produce it, the growth in popularity of non-traditional procurement systems, and the challenge of using the information within the document in a construction schedule. With these issues in mind, building information modeling (BIM) and virtual reality (VR) are combined and proposed as a potential solution that allows inclusion of the client into the design process. Following a literature review and precedent study, an experiment was carried out using this new process to simulate a client’s design decisions on window and interior furnishings. The choices made by the client using VR automatically updated a B/Q schedule built in Revit and allowed them to have a firm understanding of project costs. Besides giving the client more confidence in a pleasing final outcome, the technology also ensured an up-to-date, accurate, and easily understandable B/Q. The proposed method features great potential savings in cost and time and gives the B/Q a newfound importance in future construction processes. The research case presented in this paper is a stepping stone in exploring new opportunities offered by VR and BIM and how they could improve the reliability and accuracy of traditional procurement within construction, specifically within the B/Q document.

关键词: virtual reality     bill of quantities     BIM     Revit     real-time synchronisation    

标题 作者 时间 类型 操作

Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: a proof of concept study

Jordan DAVIDSON, John FOWLER, Charalampos PANTAZIS, Massimo SANNINO, Jordan WALKER, Moslem SHEIKHKHOSHKAR, Farzad Pour RAHIMIAN

期刊论文