检索范围:
排序: 展示方式:
Smoothing ramp events in wind farm based on dynamic programming in energy internet
Jiang LI, Guodong LIU, Shuo ZHANG
《能源前沿(英文)》 2018年 第12卷 第4期 页码 550-559 doi: 10.1007/s11708-018-0593-8
The concept of energy internet has been gradually accepted, which can optimize the consumption of fossil energy and renewable energy resources. When wind power is integrated into the main grid, ramp events caused by stochastic wind power fluctuation may threaten the security of power systems. This paper proposes a dynamic programming method in smoothing ramp events. First, the energy internet model of wind power, pumped storage power station, and gas power station is established. Then, the optimization problem in the energy internet is transformed into a multi-stage dynamic programming problem, and the dynamic programming method proposed is applied to solve the optimization problem. Finally, the evaluation functions are introduced to evaluate pollutant emissions. The results show that the dynamic programming method proposed is effective for smoothing wind power and reducing ramp events in energy internet.
关键词: energy internet wind power ramp events dynamic programming
张钊,裴燕玲,张仁宝
《中国工程科学》 2005年 第7卷 第2期 页码 62-65
动态规划求最优解是一个反向递推的求解过程,以实例为依据,用正向递推的方法求解动态规划的最优值,并推出动态规划的基本方程和密尔顿-雅可比方程,是对动态规划求最优解方法的探讨。利用动态规划的正向递推方法,在应用中可以大大减少计算量,扩大了它的应用范围。
Balasubramaniyan SARAVANAN, Surbhi SIKRI, K. S. SWARUP, D. P. KOTHARI
《能源前沿(英文)》 2013年 第7卷 第3期 页码 333-341 doi: 10.1007/s11708-013-0259-5
关键词: unit commitment (UC) deterministic stochastic dynamic programming (DP) optimization state diagram
张进之,段春华
《中国工程科学》 2000年 第2卷 第6期 页码 67-72
文章介绍了应用解析板形方程推出板形最佳轧制规程和板形板厚协调控制新方法。该方法的主要特点:系统中采用了静、动态负荷分配,动态设定厚度自动控制系统(DAGC)完成了板形板厚的闭环控制,在算法中采用了贝尔曼动态规划。新方法将会改变目前轧机设计和控制思想:设计合理刚度,强调调度计划、配置轧辊凸度和优化轧制规程等方面的作用,实现信息控制。
Review on ranking and selection: A new perspective
L. Jeff HONG, Weiwei FAN, Jun LUO
《工程管理前沿(英文)》 2021年 第8卷 第3期 页码 321-343 doi: 10.1007/s42524-021-0152-6
关键词: ranking and selection hypothesis testing dynamic programming simulation
胡程顺,钟登华,张静,洪文,李明超
《中国工程科学》 2003年 第5卷 第12期 页码 73-79
土石方调配是土石坝或堆石坝施工中的一个核心问题,其合理与否对降低工程造价和保证工程的顺 利进行具有重要的经济、技术价值。根据其受时间-空间影响与约束的特点,文章在总结现有研究成果的基础 上,采用系统分析的手段,提出了一种将动态问题静态化的方法,并利用线性规划大M单纯形法对问题进行求 解。在数学模型上,深入而细致地考虑了实际施工中的一些人为约束因素,增强了模型的通用性与灵活性;借 助于GIS技术的强大空间信息处理功能,将土石方调配成果以三维动画的形式显示出来,以达到形象直观的目 的;在程序实现上,采用强大的程序设计语言工具VC++开发出了界面友好、操作简单、适用性强的软件。最 后,以其在某大型土石坝工程土石方调配项目中的成功应用,验证了此项研究工作的合理性与优越性。
基于车联网的信号灯协同控制 Article
李婉, 班学钢
《工程(英文)》 2020年 第6卷 第12期 页码 1463-1472 doi: 10.1016/j.eng.2020.10.009
本文提出了一个基于车联网(CV)环境的交通主干道信号灯协同控制的模型及其求解方法。首先, 我们将信号优化与协同控制问题归结为一个混合整数非线性规划(MINLP)。通过考虑单个车辆轨迹的最小油耗和行程时间求解最优相位持续时间和相位差。由于模型的复杂性,我们将问题分解为两个层次:使用动态规划(DP)优化相位持续时间的交叉路口层,以及用于优化所有交叉路口相位差的干道交通层。同时,我们开发了一种基于预测的方法以求解上述双层优化模型。在各种场景下,我们利用交通模拟对模型进行了测试。与传统的感应信号灯协同控制相比,求解MINLP和双层优化模型生成的信号时序规划可以合理地提升交通信号灯控制性能和路网的服务水平。在高密度的交通流量的环境中并考虑不同车辆类型时,与感应信号灯相比,上述双层优化模型的求解法使路网总成本降低了3.8%,MINLP的应用使系统总成本降低了5.9%。这也表明对于交通密度相对较高的干道交通来说,本文提出的协同控制方案效果显著。而仿真结果也表明对于同时拥有主要道路和次要道路的交叉路口而言,面向主要道路进行的协同控制对次要道路上的车辆几乎没有影响。
Technology and system of constraint programming for industry production scheduling
Yarong CHEN, Zailin GUAN, Yunfang PENG, Xinyu SHAO, Muhammad HASSEB
《机械工程前沿(英文)》 2010年 第5卷 第4期 页码 455-464 doi: 10.1007/s11465-010-0106-x
关键词: constraint programming production scheduling constraint propagation search consistency optimization
Shengwen ZHANG, Guicheng WANG, Liang ZHANG, Xifeng FANG
《机械工程前沿(英文)》 2009年 第4卷 第1期 页码 97-102 doi: 10.1007/s11465-009-0007-z
《工程管理前沿(英文)》 页码 67-81 doi: 10.1007/s42524-022-0240-2
关键词: logistics network design post-disruption response strategy two-stage stochastic programming conditional value at risk robust constraint
《工程管理前沿(英文)》 页码 452-461 doi: 10.1007/s42524-022-0209-1
关键词: CO2 emissions demand side regulation multi-regional input–output model linear programming model
Uncertain and multi-objective programming models for crop planting structure optimization
Mo LI,Ping GUO,Liudong ZHANG,Chenglong ZHANG
《农业科学与工程前沿(英文)》 2016年 第3卷 第1期 页码 34-45 doi: 10.15302/J-FASE-2016084
关键词: crop planting structure optimization model uncertainty multi-objective
张虹,李歧强
《中国工程科学》 2004年 第6卷 第10期 页码 65-70
通过对现有生产调度模糊模型的分析,针对间歇生产过程,提出了一种新颖的参数模糊的通用模糊规划建模方法,模糊模型采用2种基于普通遗传算法的模糊算法,即模糊模拟和SFA算法。该方法中,参数隶属函数选取灵活,采用合适的模糊表示方式。最后通过实例验证了该模糊建模方法是一种有效的方法。
Pingjian YANG,Feifei DONG,Yong LIU,Rui ZOU,Xing CHEN,Huaicheng GUO
《环境科学与工程前沿(英文)》 2016年 第10卷 第1期 页码 129-140 doi: 10.1007/s11783-014-0683-8
关键词: refined risk explicit interval linear programming decision making objective-constraint uncertainty tradeoff aspiration level Lake Qionghai Watershed
标题 作者 时间 类型 操作
Smoothing ramp events in wind farm based on dynamic programming in energy internet
Jiang LI, Guodong LIU, Shuo ZHANG
期刊论文
Unit commitment using dynamic programming–an exhaustive working of both classical and stochastic approach
Balasubramaniyan SARAVANAN, Surbhi SIKRI, K. S. SWARUP, D. P. KOTHARI
期刊论文
Technology and system of constraint programming for industry production scheduling
Yarong CHEN, Zailin GUAN, Yunfang PENG, Xinyu SHAO, Muhammad HASSEB
期刊论文
CNC programming system for complex components based on KBE within integrated environment of CAD/CAPP/
Shengwen ZHANG, Guicheng WANG, Liang ZHANG, Xifeng FANG
期刊论文
Two-stage stochastic programming with robust constraints for the logistics network post-disruption response
期刊论文
Cutting CO emissions through demand side regulation: Implications from multi-regional input–output linear programming
期刊论文
Uncertain and multi-objective programming models for crop planting structure optimization
Mo LI,Ping GUO,Liudong ZHANG,Chenglong ZHANG
期刊论文