资源类型

期刊论文 102

会议视频 2

年份

2023 4

2022 4

2021 8

2020 4

2019 5

2018 8

2017 3

2016 5

2015 6

2014 10

2013 5

2012 2

2011 6

2010 8

2009 2

2008 7

2007 4

2006 4

2005 1

2004 2

展开 ︾

关键词

生态补偿 4

误差补偿 3

运动补偿 3

运动估计 2

铝合金 2

预处理工艺 2

6016 合金 1

CD44 1

DQP漂白 1

KP法制浆 1

PPP项目 1

k-最近邻分类 1

三峡工程 1

三峡库区 1

不确定时延 1

不良妊娠结局 1

临震前磁异常 1

主成分分析 1

互感器 1

展开 ︾

检索范围:

排序: 展示方式:

A pre-compensation method of the systematic contouring error for repetitive command paths

D. L. ZHANG,Y. H. CHEN,Y. P. CHEN

《机械工程前沿(英文)》 2015年 第10卷 第4期   页码 367-372 doi: 10.1007/s11465-015-0367-5

摘要:

For a repetitive command path, pre-compensating the contouring error by modifying the command path is practical. To obtain the pre-compensation value with better accuracy, this paper proposes the use of a back propagation neural network to extract the function of systematic contouring errors. Furthermore, by using the extracted function, the contouring error can be easily pre-compensated. The experiment results verify that the proposed compensation method can effectively reduce contouring errors.

关键词: contouring error     pre-compensation     motion control system     back propagation (BP) neural network    

Performance analysis of series/parallel and dual side LCC compensation topologies of inductive power

P. Srinivasa Rao NAYAK, Dharavath KISHAN

《能源前沿(英文)》 2020年 第14卷 第1期   页码 166-179 doi: 10.1007/s11708-018-0549-z

摘要: In an inductive battery charging system, for better power transfer capability and attaining required power level, compensation is necessary. This paper analyzes series/parallel (S/P) and dual side inductor-capacitor-capacitor (LCC) compensation topologies for inductive power transfer of electric vehicle (EV) battery charging system. The design and modeling steps of inductive power transfer for electric vehicle battery charging system are presented. Besides, the equivalent electrical circuits are used to describe the circuit compensation topologies. The results convey that the efficiency of dual side LCC compensation is higher than that of S/P compensation at variable mutual inductance (misalignment).

关键词: series/parallel compensation     electric vehicle (EV)     dual side LCC compensation     inductive power transfer    

Research on the ecological compensation standard of the basin pollution control project based on evolutionary

Dongbin HU, Huiwu LIU, Xiaohong CHEN, Yang CHEN

《工程管理前沿(英文)》 2019年 第6卷 第4期   页码 575-583 doi: 10.1007/s42524-019-0044-1

摘要: Ecological compensation is a new resource and environment management model. As one of the main areas for implementing ecological compensation policies, basin ecological compensation has become an important measure for encouraging basin pollution control projects and improving the quality of regional economic development. By applying the basic game analysis of evolutionary game theory and building an evolutionary game model with a “reward–punishment” mechanism, this paper compares the interest-related decision-making behaviors of the upstream and downstream stakeholders of basin ecological compensation. By using data on the water quality of Xiangjiang River Basin, this paper calculates the rewards and penalties in different intervals by building a parametric regression mathematical model and employing the local linear regression method. Results show that a decline in water quality should be fined RMB 925500 yuan, an improvement in water quality should be awarded RMB 1227800 yuan, and a deteriorating water quality should be severely fined RMB 5087600 yuan.

关键词: evolutionary game     ecological compensation standard     Xiangjiang River Basin    

Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection

Siu-Lai CHAN, Yaopeng LIU, Andy LEE,

《结构与土木工程前沿(英文)》 2010年 第4卷 第3期   页码 376-382 doi: 10.1007/s11709-010-0086-2

摘要: Pre-tensioned high strength trusses using alloy steel bar are widely used as glass wall supporting systems because of the high degree of transparency. The breakage of glass panes in this type of system occurs occasionally, likely to be due to error in design and analysis in addition to other factors like glass impurity and stress concentration around opening in a spider system. Most design does not consider the flexibility of supports from finite stiffness of supporting steel or reinforced concrete beams. The resistance of lateral wind pressure of the system makes use of high tension force coupled with the large deflection effect, both of which are affected by many parameters not generally considered in conventional structures. In the design, one must therefore give a careful consideration on various effects, such as support settlement due to live loads and material creep, temperature change, pre-tension force, and wind pressure. It is not uncommon to see many similar glass wall systems fail in the wind load test chambers under a design wind speed. This paper presents a rigorous analysis and design of this type of structural systems used in a project in Hong Kong, China. The stability function with initial curvature is used in place of the cubic function, which is only accurate for linear analysis. The considerations and analysis techniques are believed to be of value to engineers involved in the design of the structural systems behaving nonlinearly.

关键词: tension system     glass wall     nonlinear analysis     pre-tensioning     second-order analysis    

筑坝河流的生态补偿

董哲仁

《中国工程科学》 2006年 第8卷 第1期   页码 5-10

摘要:

从河流的连续性特征出发分析了大坝对于河流生态系统的胁迫问题。指出要在自然-社会-经济复合生态系统中全面权衡筑坝的利弊得失。讨论了对于筑坝河流进行生态补偿的可行性,建议开展河流生态系统功能价值评估,建立生态补偿的合理机制。

关键词: 大坝     河流     生态补偿     生态恢复     补偿机制    

Quantitative standard of eco-compensation for the water source area in the middle route of the South-to-North

Zhanfeng DONG, Jinnan WANG

《环境科学与工程前沿(英文)》 2011年 第5卷 第3期   页码 459-473 doi: 10.1007/s11783-010-0288-9

摘要: The Middle Route Project(MRP) of the South-to-North Water Transfer Scheme (SNWT) in China will require a very large financial expenditure to ensure the water supply and the associated water quality to northern China. An eco-compensation mechanism between the water service source areas and its beneficiaries is essential. This paper establishes an analytic framework of eco-compensation standard for the protection of the water source area, including both the calculation of eco-compensation based on opportunity cost method (OCM) and calculation of the burden sharing of eco-compensation between the water source area and the external water reception area based on the deviation square method (DSM). Taking Shiyan City, Hubei Province in China as a case study, our results show that the eco-compensation in the first-phase of MRP for the water source area in Shiyan, Hubei Province should be 1.63×10 CNY, about four times of planned eco-construction investment budget(4.33×10 CNY). In addition, the burden sharing of eco-compensation varied greatly in terms of different methods. It would be better to integrate the results of different single-factor burden sharing methods by determining the corresponding weighting coefficient with DSM and form one unanimous consent result by the interested parties.

关键词: the South-to-North Water Transfer Scheme     eco-compensation standard     opportunity costs     deviation square method    

Social responsibility in infrastructure mega-projects: A case study of ecological compensation for

Zheming LIU, Liangyan WANG, Zhaohan SHENG, Xinglin GAO

《工程管理前沿(英文)》 2018年 第5卷 第1期   页码 98-108 doi: 10.15302/J-FEM-2018084

摘要: Ecological compensation plays an important role in implementing the social responsibility of infrastructure mega-projects. Based on the results of a field study, an in-depth interview, and archive data, this paper introduces the ecological compensation for (the Indo-Pacific humpbacked dolphin) during the construction of the Hong Kong-Zhuhai-Macao Bridge. It studies the concrete measures, decision-making processes, and organizational collaboration of the ecological compensation, using the method of a case study. The present study not only enriches our understanding of the ecological compensation practice during the construction of infrastructure mega-projects, but also extends the literature on the social responsibility of infrastructure mega-projects. This sheds light on the protection of the environment as well as biodiversity in the construction of future infrastructure mega-projects.

关键词: infrastructure mega-projects     social responsibility     ecological compensation     Hong Kong-Zhuhai-Macao Bridge     Sousa chinensis    

Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete

《结构与土木工程前沿(英文)》 2023年 第17卷 第3期   页码 411-428 doi: 10.1007/s11709-023-0928-3

摘要: In this study, ultrahigh-performance fiber-reinforced concrete (UHPFRC) used in a type B70 concrete sleeper is investigated experimentally and parametrically. The main parameters investigated are the steel fiber volume fractions (0%, 0.5%, 1%, and 1.5%). Under European standards, 35 UHPFRC sleepers are subjected to static bending tests at the center and rail seat sections, and the screw on the fastening system is pulled out. The first cracking load, failure load, failure mode, crack propagation, load–deflection curve, load–crack width, and failure load from these tests are measured and compared with those of a control sleeper manufactured using normal concrete C50. The accuracy of the parametric study is verified experimentally. Subsequently, the results of the study are applied to UHPFRC sleepers with different concrete volumes to investigate the effects of the properties of UHPFRC on their performance. Experimental and parametric study results show that the behavior of UHPFRC sleepers improves significantly when the amount of steel fiber in the mix is increased. Sleepers manufactured using UHPFRC with a steel fiber volume fraction of 1% and a concrete volume less than 25% that of standard sleeper B70 can be used under the same loads and requirements, which contributes positively to the cost and surrounding environment.

关键词: pre-stressed concrete sleeper     ultrahigh performance fiber-reinforced concrete     pull-out test     static bending test     steel fiber     aspect ratio     volume fraction    

Determination of the scheme of precision grinding compensation on the radome

GUO Dongming, LIU Minjing, ZHANG Chunbo, SHENG Xianjun, SUN Yuwen

《机械工程前沿(英文)》 2007年 第2卷 第3期   页码 263-266 doi: 10.1007/s11465-007-0045-3

摘要: The radome, which is often used to house airborne scanning radar antennas, causes a large boresight error and boresight error slope of the radar antenna. One way to decrease the boresight error induced by the radome is to modify its geometric thickness. Determining the grinding scheme from the boresight error performance is the most important problem to be solved. A typical inverse problem about electromagnetic fields is solving the precise grinding compensation area and allowance according to the antenna aperture distribution and the radome s boresight error performance, which could hardly be solved by a purely mathematical method. An effective approach combining theoretical analysis and mathematical calculations with experimental measurement is presented in this paper to determine the grinding area and allowance for compensating the boresight error performance of the radome. By comparing the calculated and measured data of the boresight error and the boresight error slope before and after grinding, it is shown that this method is simple and practical and can be used for many kinds of radomes.

关键词: mathematical     effective approach     experimental measurement     antenna     electromagnetic    

Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting

John O’MALLEY, Hakim S. ABDELGADER,

《结构与土木工程前沿(英文)》 2010年 第4卷 第1期   页码 127-132 doi: 10.1007/s11709-010-0007-4

摘要: Two-stage (pre-placed aggregate) concrete (TSC) consists of coarse aggregate, which is first deposited into the formwork, and grout, which is later pumped into the formwork from the bottom up to bind the stone together into a monolith. During the course of this study the formation of grout for two stage concrete was investigated using readily available 5 mm sand mixed in a slow speed paddle mixer.  Silica fume and a superplasticizer were used in the mix to see if the necessary stability and fluidity could be achieved without the use of a specialized plant, essentially to see if TSC could be produced on a small scale using native Irish aggregates. A much higher degree of sedimentation was recorded during testing than was expected. As a result, the use of 5 mm sand and a slow speed mixer in combination were found to be not conducive to the successful production of TSC grout, without further research and testing.

关键词: grout     pre-placed     concrete     two-stage concrete (TSC)    

Ecological compensation based on willingness to accept for conservation of drinking water sources

Linyu XU,Bing YU,Yang LI

《环境科学与工程前沿(英文)》 2015年 第9卷 第1期   页码 58-65 doi: 10.1007/s11783-014-0688-3

摘要: Ecological compensation is a powerful environmental economic tool for environmental protection in areas where drinking water sources are located. We established an ecological compensation accounting system based on respondents’ willingness to accept (WTA). In this system, stakeholder preferences and the factors that influence them can be gauged effectively using logit and tobit models. We applied this accounting system to ecological compensation for the Miyun Reservoir, Beijing, China. The average WTA value for Miyun Reservoir residents was approximately 1186 CNY per family in 2012, which could be set as a suitable compensation standard, since it is slightly higher than the local protection cost. Thus, the annual total ecological compensation could be 58.73 million CNY. Distance from the reservoir, job types, and attitude to environmental protection were variables with significant effects on WTA. In addition, trends for individual preferences were identified via an analysis of key influential factors. The results suggest some useful information for establishing ecological compensation mechanisms for conservation of drinking water sources. Suggestions include popularizing the concept and meaning of ecological compensation among residents, setting different compensation levels based on distance from the reservoir, considering the requirements of farmers, and taking various in-kind and out-of-kind compensation approaches.

关键词: contingent valuation method     questionnaire survey     Miyun Reservoir    

A combined modulated feedback and temperature compensation approach to improve bias drift of a closed-loop

Ming-jun MA,Zhong-he JIN,Hui-jie ZHU

《信息与电子工程前沿(英文)》 2015年 第16卷 第6期   页码 497-510 doi: 10.1631/FITEE.1400349

摘要: The bias drift of a micro-electro-mechanical systems (MEMS) accelerometer suffers from the 1/ noise and the temperature effect. For massive applications, the bias drift urgently needs to be improved. Conventional methods often cannot address the 1/ noise and temperature effect in one architecture. In this paper, a combined approach on closed-loop architecture modification is proposed to minimize the bias drift. The modulated feedback approach is used to isolate the 1/ noise that exists in the conventional direct feedback approach. Then a common mode signal is created and added into the closed loop on the basis of modulated feedback architecture, to compensate for the temperature drift. With the combined approach, the bias instability is improved to less than 13 μ , and the drift of the Allan variance result is reduced to 17 μ at 100 s of the integration time. The temperature coefficient is reduced from 4.68 to 0.1 m /°C. The combined approach could be useful for many other closed-loop accelerometers.

关键词: Bias drift     Closed-loop MEMS accelerometer     Modulated feedback approach     Temperature compensation    

Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A

Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng

《环境科学与工程前沿(英文)》 2018年 第12卷 第5期 doi: 10.1007/s11783-018-1084-1

摘要:

A novel two sludge pre-A2NSBR system was developed.

Advanced N and P removal was optimized to treat real domestic wastewater.

Nitrifiers and PAOs were enriched with 19.41% and 26.48%, respectively.

Acetate was demonstrated as the high-quality carbon source type.

关键词: Denitrifying phosphorus removal     C/N ratio     Nitrate recycling     Carbon source type     Biological nutrient removal     Pre-A2NSBR system    

Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder

Ali Fadhil NASER, Zonglin WANG

《结构与土木工程前沿(英文)》 2013年 第7卷 第2期   页码 164-177 doi: 10.1007/s11709-013-0196-8

摘要: The objectives of this study are to explain the repairing and strengthening methods which are used to improve the structural performance of the bridge structure, to analyze the static and dynamic responses after strengthening, and to evaluate the performance of the bridge structure after repairing and strengthening. The methods of repairing and strengthening include reconstruction the deck of the bridge by casting 10 cm layer of concrete, strengthening the web and bottom floor of box girders of middle spans and side spans by sticking the steel plates, strengthening the whole bridge structure by using external pre-stressing tendons, and treatment the cracks. The results of theoretical analysis show that the values of tensile stress and vertical deflection are decreased and the compressive stress is increased after strengthening. There are not tensile stresses are appeared in the sections of the bridge structure. The modal analysis results show that the value of natural frequency is equal to 2.09 Hz which is more than the values before strengthening which is equal to 1.64 Hz, indicating that the stiffness of the bridge structure is improved and the strengthening process is effective to improve the cracks resistance and bearing capacity of the bridge structure.

关键词: structural performance     steel plates     external pre-stressing     cracks     grouting method     static    

Techno-economic comparison of three technologies for pre-combustion CO

Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen

《化学科学与工程前沿(英文)》 2020年 第14卷 第3期   页码 436-452 doi: 10.1007/s11705-019-1870-8

摘要: This paper compares the techno-economic performances of three technologies for CO capture from a lignite-based IGCC power plant located in the Czech Republic: (1) Physical absorption with a Rectisol-based process; (2) Polymeric CO -selective membrane-based capture; (3) Low-temperature capture. The evaluations show that the IGCC plant with CO capture leads to costs of electricity between 91 and 120 €·MWh , depending on the capture technology employed, compared to 65 €·MWh for the power plant without capture. This results in CO avoidance costs ranging from 42 to 84 €· , mainly linked to the losses in net power output. From both energy and cost points of view, the low-temperature and Rectisol based CO capture processes are the most efficient capture technologies. Furthermore, partial CO capture appears as a good mean to ensure early implementation due to the limited increase in CO avoidance cost when considering partial capture. To go beyond the two specific CO -selective membranes considered, a cost/membrane property map for CO -selective membranes was developed. This map emphasise the need to develop high performance membrane to compete with solvent technology. Finally, the cost of the whole CCS chain was estimated at 54 €· once pipeline transport and storage are taken into consideration.

关键词: carbon capture and storage (CCS)     techno-economic comparison     pre-combustion capture     physical solvent     low-temperature capture    

标题 作者 时间 类型 操作

A pre-compensation method of the systematic contouring error for repetitive command paths

D. L. ZHANG,Y. H. CHEN,Y. P. CHEN

期刊论文

Performance analysis of series/parallel and dual side LCC compensation topologies of inductive power

P. Srinivasa Rao NAYAK, Dharavath KISHAN

期刊论文

Research on the ecological compensation standard of the basin pollution control project based on evolutionary

Dongbin HU, Huiwu LIU, Xiaohong CHEN, Yang CHEN

期刊论文

Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection

Siu-Lai CHAN, Yaopeng LIU, Andy LEE,

期刊论文

筑坝河流的生态补偿

董哲仁

期刊论文

Quantitative standard of eco-compensation for the water source area in the middle route of the South-to-North

Zhanfeng DONG, Jinnan WANG

期刊论文

Social responsibility in infrastructure mega-projects: A case study of ecological compensation for

Zheming LIU, Liangyan WANG, Zhaohan SHENG, Xinglin GAO

期刊论文

Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete

期刊论文

Determination of the scheme of precision grinding compensation on the radome

GUO Dongming, LIU Minjing, ZHANG Chunbo, SHENG Xianjun, SUN Yuwen

期刊论文

Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting

John O’MALLEY, Hakim S. ABDELGADER,

期刊论文

Ecological compensation based on willingness to accept for conservation of drinking water sources

Linyu XU,Bing YU,Yang LI

期刊论文

A combined modulated feedback and temperature compensation approach to improve bias drift of a closed-loop

Ming-jun MA,Zhong-he JIN,Hui-jie ZHU

期刊论文

Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A

Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng

期刊论文

Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder

Ali Fadhil NASER, Zonglin WANG

期刊论文

Techno-economic comparison of three technologies for pre-combustion CO

Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen

期刊论文