资源类型

期刊论文 915

年份

2024 1

2023 71

2022 65

2021 73

2020 52

2019 56

2018 64

2017 69

2016 31

2015 43

2014 38

2013 32

2012 25

2011 31

2010 38

2009 27

2008 40

2007 34

2006 25

2005 12

展开 ︾

关键词

过程强化 6

人工智能 5

规划 5

三峡工程 4

优化 4

不确定性 3

乡村规划 3

优化调度 3

可持续发展 3

智能制造 3

2035年 2

CAPP 2

DSM(设计结构矩阵) 2

TRIZ 2

上海港 2

任务调度 2

催化剂 2

凝固过程 2

层次分析法 2

展开 ︾

检索范围:

排序: 展示方式:

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

《机械工程前沿(英文)》 2015年 第10卷 第4期   页码 392-404 doi: 10.1007/s11465-015-0353-y

摘要:

For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

关键词: integrated process planning and scheduling (IPPS)     dispatching rules     priority based optimization algorithm     multi-objective optimization    

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

《化学科学与工程前沿(英文)》 2023年 第17卷 第10期   页码 1516-1532 doi: 10.1007/s11705-022-2283-7

摘要: This paper focuses on the integrated problem of long-term planning and short-term scheduling in a large-scale refinery-petrochemical complex, and considers the overall manufacturing process from the upstream refinery to the downstream petrochemical site. Different time scales are incorporated from the planning and scheduling subproblems. At the end of each discrete time period, additional constraints are imposed to ensure material balance between different time scales. Discrete time representation is applied to the planning subproblem, while continuous time is applied to the scheduling of ethylene cracking and polymerization processes in the petrochemical site. An enterprise-wide mathematical model is formulated through mixed integer nonlinear programming. To solve the problem efficiently, a heuristic algorithm combined with a convolutional neural network (CNN), is proposed. Binary variables are used as the CNN input, leading to the integration of a data-driven approach and classical optimization by which a heuristic algorithm is established. The results do not only illustrate the detailed operations in a refinery and petrochemical complex under planning and scheduling, but also confirm the high efficiency of the proposed algorithm for solving large-scale problems.

关键词: planning     scheduling     refinery-petrochemical     convolutional neural network     heuristic algorithm    

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 1-26 doi: 10.1007/s42524-020-0093-5

摘要: The airline industry is a representative industry with high cost and low profitability. Therefore, airlines should carefully plan their schedules to ensure that overall profit is maximized. We review the literature on airline planning and scheduling and focus on mathematical formulations and solution methodologies. Our research framework is anchored on three major problems in the airline scheduling, namely, fleet assignment, aircraft routing, and crew scheduling. General formulation, widely used solution approaches, and important extensions are presented for each problem and integrated problems. We conclude the review by identifying promising areas for further research.

关键词: airline planning     fleet assignment problem     aircraft routing problem     crew pairing problem     crew rostering problem     crew scheduling problem     integrated planning    

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

《机械工程前沿(英文)》 2006年 第1卷 第3期   页码 305-312 doi: 10.1007/s11465-006-0039-6

摘要: It is extremely important for procedure of process design and management of process data for product life cycle in Computer Aided Process Planning (CAPP) system, but there are many shortcomings with traditional CAPP system in these respects. To solve these questions, application of workflow technology in CAPP system based on web-integrated Bill of Material (BOM) tree is discussed, and a concept of integrated BOM tree was brought forward. Taking integrated BOM as the thread, CAPP systematic technological process is analyzed. The function, system architecture, and implementation mechanism of CAPP system based on Browser/Server and Customer/Server model are expatiated. Based on it, the key technologies of workflow management device were analyzed. Eventually, the implementation mechanism of integrated BOM tree was analyzed from viewpoints of material information encoding, organization node design of integrated BOM tree, transformation from Engineering BOM (EBOM) to Process BOM(PBOM), and the programming implementation technology.

关键词: PBOM     systematic technological     implementation technology     management     workflow technology    

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

《工程管理前沿(英文)》 2020年 第7卷 第3期   页码 373-383 doi: 10.1007/s42524-020-0123-3

摘要: Production planning and scheduling are becoming the core of production management, which support the decision of a petrochemical company. The optimization of production planning and scheduling is attempted by every refinery because it gains additional profit and stabilizes the daily production. The optimization problem considered in industry and academic research is of different levels of realism and complexity, thus increasing the gap. Operation research with mathematical programming is a conventional approach used to address the planning and scheduling problem. Additionally, modeling the processes, objectives, and constraints and developing the optimization algorithms are significant for industry and research. This paper introduces the perspective of production planning and scheduling from the development viewpoint.

关键词: planning and scheduling     optimization     modeling    

Perspectives in multilevel decision-making in the process industry

Braulio BRUNAUD, Ignacio E. GROSSMANN

《工程管理前沿(英文)》 2017年 第4卷 第3期   页码 256-270 doi: 10.15302/J-FEM-2017049

摘要: Decisions in supply chains are hierarchically organized. Strategic decisions involve the long-term planning of the structure of the supply chain network. Tactical decisions are mid-term plans to allocate the production and distribution of materials, while operational decisions are related to the daily planning of the execution of manufacturing operations. These planning processes are conducted independently with minimal exchange of information between them. Achieving a better coordination between these processes allows companies to capture benefits that are currently out of their reach and improve the communication among their functional areas. We propose a network representation for the multilevel decision structure and analyze the components that are involved in finding integrated solutions that maximize the sum of the benefits of all nodes of the decision network. Although such task is very challenging, significant research progress has been made in each component of this structure. An overview of strategic models, mid-term planning models, and scheduling models is presented to address the solution of each node in the decision network. Coordination mechanisms for converging the integrated solutions are also analyzed, including solving large-scale models, multiobjective optimization, bi-level programming, and decomposition. We conclude by summarizing the challenges that hinder the full integration of multilevel decision making in supply chain management.

关键词: supply chain optimization     enterprise-wide optimization     multilevel optimization     planning     scheduling    

An integrated assessment method of urban drainage system: A case study in Shenzhen City, China

DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan

《环境科学与工程前沿(英文)》 2008年 第2卷 第2期   页码 150-156 doi: 10.1007/s11783-008-0014-z

摘要: In recent years, the urban drainage system in China is facing the dual pressure of renovation and construction. This requires that the integrated assessment for the planning and operation of the urban drainage system is obligatory. To evaluate the urban drainage system, an integrated assessment methodology based on the analytic hierarchy process (AHP), integrated simulation, and fuzzy assessment is established. This method is a multi-criteria decision adding app roach to the assessment of the urban drainage system comprehensively. Through the integration of the Storm Water Management Model (SWMM), a simple wastewater treatment plant model, and a surface water quality model, an integrated modelling system for the urban drainage system is developed and applied as a key tool for assessment. Using the established method, a case study in Shenzhen City has been implemented to evaluate and compare two urban drainage system reno vation plans, the distributed plan and the centralized plan. Because of the particularity of this case study, the established method is not applied entirely. Considering the water environ mental impact, ecological impact, technological feasibility, and economic cost, the integrated performance of the distri buted plan is better. As shown in this case study, the proposed method is found to be both effective and practical.

关键词: integrated assessment     hierarchy process     centralized     technological feasibility     planning    

Active-reactive power scheduling of integrated electricity-gas network with multi-microgrids

《能源前沿(英文)》 2023年 第17卷 第2期   页码 251-265 doi: 10.1007/s11708-022-0857-1

摘要: Advances in natural gas-fired technologies have deepened the coupling between electricity and gas networks, promoting the development of the integrated electricity-gas network (IEGN) and strengthening the interaction between the active-reactive power flow in the power distribution network (PDN) and the natural gas flow in the gas distribution network (GDN). This paper proposes a day-ahead active-reactive power scheduling model for the IEGN with multi-microgrids (MMGs) to minimize the total operating cost. Through the tight coupling relationship between the subsystems of the IEGN, the potentialities of the IEGN with MMGs toward multi-energy cooperative interaction is optimized. Important component models are elaborated in the PDN, GDN, and coupled MMGs. Besides, motivated by the non-negligible impact of the reactive power, optimal inverter dispatch (OID) is considered to optimize the active and reactive power capabilities of the inverters of distributed generators. Further, a second-order cone (SOC) relaxation technology is utilized to transform the proposed active-reactive power scheduling model into a convex optimization problem that the commercial solver can directly solve. A test system consisting of an IEEE-33 test system and a 7-node natural gas network is adopted to verify the effectiveness of the proposed scheduling method. The results show that the proposed scheduling method can effectively reduce the power losses of the PDN in the IEGN by 9.86%, increase the flexibility of the joint operation of the subsystems of the IEGN, reduce the total operation costs by $32.20, and effectively enhance the operation economy of the IEGN.

关键词: combined cooling     heating     and power (CCHP)     integrated energy systems (IES)     natural gas     power distribution system     gas distribution system    

Integrated transmission and generation planning model in a deregulated environment

Enrique B. CEDE?O, Sant ARORA

《能源前沿(英文)》 2013年 第7卷 第2期   页码 182-190 doi: 10.1007/s11708-013-0256-8

摘要: After the deregulation of the Power Sector in the U.S., planning for generation and transmission capacities is decentralized. There is, however, still need for the long term integrated planning of generation and transmission capacities at the macro level, since these two sectors must operate in a coordinated manner. This paper presents a model for integrating generation and transmission expansion planning to identify an indicative expansion plan for the total sector at the macro level. The argument for an integrated model is supported using evidence from integrated planning efforts in real life systems. The application of the proposed model is illustrated using an example that requires expansion of generation and transmission capacities over three regions in a deregulated power system. The example considers that addition of generating capacity should come from renewable sources. The test results show the potential cost saving from integrated planning.

关键词: integrated planning     indicative plans     power generation     transmission     deregulation    

An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing

Baoxi WANG, Zailin GUAN, Yarong CHEN, Xinyu SHAO, Ming JIN, Chaoyong ZHANG

《机械工程前沿(英文)》 2013年 第8卷 第2期   页码 137-145 doi: 10.1007/s11465-013-0251-0

摘要:

For assemble-to-order enterprises, both order scheduling and mixed-model sequencing need to be taken into consideration in the formulation of order-oriented assembly plan. First, determining production priority for the received orders, and then conducting assembly sequence to the mixed-model products in each order. Order scheduling is aimed to ensure order delivery with the optimization goal of minimal total overdue time, while product sequencing is aimed to minimize the makespan so as to meet the requirement on completion time of the order. In the end, the paper establishes a mixed integer programming model based on an industrial case, and makes programming calculation with Xpress-MP to accomplish an order-oriented assembly plan conforming to actual production.

关键词: mixed-model assembly line     assemble-to-order     order scheduling     sequencing    

大规模车辆排队的调度与规划技术的进展与挑战 Review

Jing Hou, Guang Chen, Jin Huang, Yingjun Qiao, Lu Xiong, Fuxi Wen, Alois Knoll, Changjun Jiang

《工程(英文)》 2023年 第28卷 第9期   页码 26-48 doi: 10.1016/j.eng.2023.01.012

摘要:

Through vehicle-to-vehicle (V2V) communication, autonomizing a vehicle platoon can significantly reduce the distance between vehicles, thereby reducing air resistance and improving road traffic efficiency. The gradual maturation of platoon control technology is enabling vehicle platoons to achieve basic driving functions, thereby permitting large-scale vehicle platoon scheduling and planning, which is essential for industrialized platoon applications and generates significant economic benefits. Scheduling and planning are required in many aspects of vehicle platoon operation; here, we outline the advantages and challenges of a number of the most important applications, including platoon formation scheduling, lane-change planning, passing traffic light scheduling, and vehicle resource allocation. This paper's primary objective is to integrate current independent platoon scheduling and planning techniques into an integrated architecture to meet the demands of large-scale platoon applications. To this end, we first summarize the general techniques of vehicle platoon scheduling and planning, then list the primary scenarios for scheduling and planning technique application, and finally discuss current challenges and future development trends in platoon scheduling and planning. We hope that this paper can encourage related platoon researchers to conduct more systematic research and integrate multiple platoon scheduling and planning technologies and applications.

关键词: Autonomous vehicle platoon     Autonomous driving     Connected and automated vehicles     Scheduling and planning techniques    

A novel approach for remanufacturing process planning considering uncertain and fuzzy information

《机械工程前沿(英文)》 2021年 第16卷 第3期   页码 546-558 doi: 10.1007/s11465-021-0639-1

摘要: Remanufacturing, as one of the optimal disposals of end-of-life products, can bring tremendous economic and ecological benefits. Remanufacturing process planning is facing an immense challenge due to uncertainties and fuzziness of recoverable products in damage conditions and remanufacturing quality requirements. Although researchers have studied the influence of uncertainties on remanufacturing process planning, very few of them comprehensively studied the interactions among damage conditions and quality requirements that involve uncertain, fuzzy information. Hence, this challenge in the context of uncertain, fuzzy information is undertaken in this paper, and a method for remanufacturing process planning is presented to maximize remanufacturing efficiency and minimize cost. In particular, the characteristics of uncertainties and fuzziness involved in the remanufacturing processes are explicitly analyzed. An optimization model is then developed to minimize remanufacturing time and cost. The solution is provided through an improved Takagi–Sugeno fuzzy neural network (T-S FNN) method. The effectiveness of the proposed approach is exemplified and elucidated by a case study. Results show that the training speed and accuracy of the improved T-S FNN method are 23.5% and 82.5% higher on average than those of the original method, respectively.

关键词: remanufacturing     uncertain and fuzzy information     process planning     T-S FNN    

卫星互联网资源管控技术研究

王龙河,周一青,曹欢,刘子凡,陈岩,陈道进,石晶林

《中国工程科学》 2023年 第25卷 第6期   页码 27-38 doi: 10.15302/J-SSCAE-2023.06.004

摘要:

卫星互联网支持全球无缝覆盖,是地面通信系统的重要扩展和延伸、构建“空天地”一体化网络的关键环节、实现网络强国的重要基础信息设施;发展卫星互联网战略意义重大,相应的资源管控研究较为迫切。本文阐述了卫星互联网的基本概念及国际发展前沿、卫星互联网资源管控的基本要素与研究进展,辨识了以卫星互联网新环境、新模式为代表的卫星互联网资源管控发展挑战,形成了相应的应对策略。设计了卫星互联网资源管控技术路线,涵盖星地网络互联互通、星地异构资源融合、智能按需服务、智慧内生等主要阶段;论证提出了卫星互联网资源管控模式与架构,构建了包括高时空动态资源表征、多维资源时间连续确定性分析、多维时变能力池索引、智能决策规划在内的卫星网络资源管控关键技术体系。研究建议,重点关注资源异质异构、网络结构动态变化、服务需求差异化的网络特征,按照优化的技术路线循序渐进发展,突破卫星网络资源管控关键技术并融合人工智能技术,从而实现智能高效的卫星网络资源管控。

关键词: 卫星互联网;资源管控;空天地一体化网络;动态资源表征;智能规划决策    

End-of-pipe or process-integrated: evidence from LMDI decomposition of China’s SO

Pingdan ZHANG

《环境科学与工程前沿(英文)》 2013年 第7卷 第6期   页码 867-874 doi: 10.1007/s11783-013-0541-0

摘要: In this study, reduction in sulfur dioxide (SO ) emission is decomposed into three parts: source prevention, process control and end-of-pipe treatment, using the Logarithmic Mean Divisia Index method (LMDI). Source prevention and process control are defined as process-integrated treatment. It is found that from 2001 to 2010 the reduction of SO emission density in China was mainly contributed by end-of-pipe treatment. From the 10th Five Year Plan (FYP) period (2001–2005) to the 11th FYP period (2006–2010), the Chinese government has attempted to enhance process-integrated treatment. However, given its initial effort, the effect is limited compared with that of the end-of-pipe treatment. The effectiveness of environmental regulation and technology in the reduction of SO density in 30 provinces (municipality/autonomous regions) from 2001 to 2010 is also investigated. This implies that environmental regulation and technology promote process control and end-of-pipe treatment significantly, but does not influence source prevention. Furthermore, environmental technology will only take effect under the circumstances of stringent environmental regulation. Therefore, to fulfill the whole process treatment, environmental regulation should be strengthened and environmental technology upgraded at the same time.

关键词: end-of-pipe     process-integrated     Logarithmic Mean Divisia Index method (LMDI)     environmental regulation     environmental technology    

The origins of schedule management: the concepts used in planning, allocating, visualizing and managing

Lynda M. BOURNE, Patrick WEAVER

《工程管理前沿(英文)》 2018年 第5卷 第2期   页码 150-166 doi: 10.15302/J-FEM-2018012

摘要: Getting the in the at the has always been a major organizational challenge. In ancient times this process seems to have been accomplished based on the scheme of arrangements being contained in the leader’s mind and instructions communicated verbally. Modern approaches to solving the twin challenges of first thinking through the ‘plan’ and then communicating the plan to the people who need to do ‘ ’ use sophisticated graphics, charts, diagrams, and computations. This paper traces the development of the concepts most project managers take for granted including bar charts and critical path schedules from their origins (which are far earlier than most people think) through to the modern day. The first section of the paper looks at the development of concepts that allow the visualization of time and other data. The second looks at the shift from static representations to dynamic modeling through the emergence of computers, dynamic calculations and integrated data from the 1950s to the present time.

关键词: time management     scheduling     CPM     PERT     Gantt     Critical Path     bar chart    

标题 作者 时间 类型 操作

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

期刊论文

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

期刊论文

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

期刊论文

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

期刊论文

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

期刊论文

Perspectives in multilevel decision-making in the process industry

Braulio BRUNAUD, Ignacio E. GROSSMANN

期刊论文

An integrated assessment method of urban drainage system: A case study in Shenzhen City, China

DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan

期刊论文

Active-reactive power scheduling of integrated electricity-gas network with multi-microgrids

期刊论文

Integrated transmission and generation planning model in a deregulated environment

Enrique B. CEDE?O, Sant ARORA

期刊论文

An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing

Baoxi WANG, Zailin GUAN, Yarong CHEN, Xinyu SHAO, Ming JIN, Chaoyong ZHANG

期刊论文

大规模车辆排队的调度与规划技术的进展与挑战

Jing Hou, Guang Chen, Jin Huang, Yingjun Qiao, Lu Xiong, Fuxi Wen, Alois Knoll, Changjun Jiang

期刊论文

A novel approach for remanufacturing process planning considering uncertain and fuzzy information

期刊论文

卫星互联网资源管控技术研究

王龙河,周一青,曹欢,刘子凡,陈岩,陈道进,石晶林

期刊论文

End-of-pipe or process-integrated: evidence from LMDI decomposition of China’s SO

Pingdan ZHANG

期刊论文

The origins of schedule management: the concepts used in planning, allocating, visualizing and managing

Lynda M. BOURNE, Patrick WEAVER

期刊论文