• Home
  • Journals
  • Focus
  • Conferences
  • Researchers
  • Sign in

Outline

  • Abstract
  • Keywords

Figures(5)

标签(1)

Table 1

其他(2)

PDF
Document

Frontiers of Chemical Science and Engineering

2018, Volume 12,  Issue 4, Pages 718-730
    • PDF
    • collect

    Extension of pilot tests of cyanide elimination by ozone from blast furnace gas washing water through Aspen Plus

    Scuola Superiore Sant’Anna, TeCIP Institute—ICT-COISP, 56124 Pisa, Italy

    Accepted: 2018-12-19 Available online:2019-01-03
    Show More
    10.1007/s11705-018-1771-2
    Cite this article
    Ismael Matino, Valentina Colla, Teresa A. Branca.Extension of pilot tests of cyanide elimination by ozone from blast furnace gas washing water through Aspen Plus[J].Frontiers of Chemical Science and Engineering,2018,12(4):718-730.

    Abstract

    For improving wastewater quality, one of the dare of steelworks is reducing cyanide in wastewater of gas washing treatment of blast furnaces. Costs of existing treatments, stringent environmental regulations and changeable composition of water from gas treatment, have led to study how available treatments can be modified and to examine new ones. Ozonation is one of cyanide treatments, tested within a European project. A process model was set up with Aspen Plus®, to assess operating conditions and wastewater distinctive characteristics and to demonstrate treatment robustness. Process was modeled by theoretical reactors, taking into account all more affecting reactions. A genetic algorithm was exploited to find kinetic parameters of these reactions. After validation, the model was used to analyse scenarios, by considering also real contexts. Pilot tests were extended, process knowledge was enhanced and suggestions were obtained. To promote cyanide removal with ozone, temperature and pH values were 30°C and 10, respectively. With an ozone (mg/h)/water (L/h) ratio of 100 mg/L, batch mode ensure reaching cyanide regulation limit (0.2 mg/L) after maximum 4.5 h, if initial amount was less than 20 mg/L. Higher removal was obtained than in continuous mode due to constraints related to this last run. Higher wastewater contamination needed further time and more ozone.

    Keywords

    blast furnace ; cyanide removal ; gas washing water ; modeling and simulation ; ozonation
    Previous article in issue
    article in issue Next
    登录后,您可以进行评论。请先登录

    评论

    评论

    • 所有评论
     咋就跳到顶部了
    2019-04-23 11:24:14
    回复 (0)
    inspur  手机账号
    2019-05-10 11:30:17
    回复 (0)

    Read

    114

    Download

    3

    Related Research

    Current Issue
      Current Issue
        Follow us
        Copyright © 2015 China Engineering Science Press.
        京ICP备11030251号
        Follow us
        Copyright © 2015 China Engineering Science Press.
        京ICP备11030251号