Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Engineering >> 2016, Volume 2, Issue 3 doi: 10.1016/J.ENG.2016.03.010

Technical Progress on Researches for the Safety of High Concrete-Faced Rockfill Dams

Huaneng Lancang River Hydropower, Inc., Kunming 650214, China

Available online: 2016-09-26

Next Previous

Abstract

The concrete-faced rockfill dam (CFRD) is an important dam type in the selection of high dams to be constructed in Western China, owing to its direct utilization of local materials, good adaptability, and distinct economic advantages. Over the past decades, China has gained successful experience in the construction of 200?m CFRDs, providing the necessary technical accumulation for the development of 250–300?m ultra-high CFRDs. This paper summarizes these successful experiences and analyzes the problems of a number of major 200?m CFRDs around the world. In addition, it discusses the key technologies and latest research progress regarding safety in the construction of 250–300?m ultra-high CFRDs, and suggests focuses and general ideas for future research.

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

References

[ 1 ] Technical Committee of the Concrete Face Rock-fill Dam of China Society for Hydropower Engineering. Appendix A: the statistics of concrete face rockfill dams above 30?m which have been built in China (by the end of 2013). In: Zhou J, Yang Z, editors Proceedings of the 2014 Symposium on Safety Research on Concrete Face Rockfill Dam and the Technical Progress of Soft-rock Damming; 2014 Sep 25−26; Nanjing, China; 2014. p. 232–4. Chinese.

[ 2 ] Technical Committee of the Concrete Face Rock-fill Dam of China Society for Hydropower Engineering. Appendix B: the statistics of concrete face rockfill dams above 30?m which are under construction in China (by the end of 2013). In: Zhou J, Yang Z, editors Proceedings of the 2014 Symposium on Safety Research on Concrete Face Rockfill Dam and the Technical Progress of Soft-rock Damming; 2014 Sep 25−26; Nanjing, China; 2014. p. 235. Chinese.

[ 3 ] Technical Committee of the Concrete Face Rock-fill Dam of China Society for Hydropower Engineering. Appendix C: the statistics of concrete face rockfill dams above 30?m which are planned to construct in China (by the end of 2013). In: Zhou J, Yang Z, editors Proceedings of the 2014 Symposium on Safety Research on Concrete Face Rockfill Dam and the Technical Progress of Soft-rock Damming; 2014 Sep 25−26; Nanjing, China; 2014. p. 236. Chinese.

[ 4 ] Cook JB, Sherard JL, editors. Concrete face rock-fill dams—design, construction, and performance. New York: American Society of Civil Engineers;?1985.

[ 5 ] Cooke JB, Sherard JL. Concrete-face rockfill dam: II. design. J Geotech Engrg 1987;113(10):1113–32 link1

[ 6 ] Cooke JB. Empirical design of the CFRD. Int J Hydropower Dams 1998;5(6): 24–7.

[ 7 ] Cooke JB. Developments in high concrete face rockfill dams. Int J Hydropower Dams 1997;4(4):69–73.

[ 8 ] Ma H, Cao K. Key technical problems of extra-high concrete faced rock-fill dam. Sci China Ser E-Technol Sci 2007;50(Supp 1):20–33 link1

[ 9 ] Zhang Z, Feng Y, Wang Y. Design and practice of Tianshengqiao-1 concrete face rock-fill dam. In: Proceedings of the 2007 Hydrology and Sediment Professional Committee of China Society for Hydropower Engineering Annual Conference and High Panel Technology Seminar; 2007 Dec 18–19; Kunming, China; 2007. Chinese.

[10] China Hydropower Engineering Consulting Group Corporation, Huaneng Lancang River Hydropower Co. Ltd., Yunnan Huadian Nujiang River Hydropower Development Co. Ltd. Research report of 300?m grade concrete faced rockfill dam adaptability and countermeasures. 2010. Chinese.

[11] Pinto NL. Very high CFRD dams—behavior and design features. In: Proceedings of the 3rd Symposium on CFRD Dams; 2007 Oct 25−27; Florianopolis, Brazil; 2007. p. 3–16.

[12] Ma H. 300?m grade concrete faced rockfill dam adaptability and countermeasures. Eng Sci 2011;13(12):4–8. Chinese.

[13] Hydro China Kunming Engineering Corporation Limited, Hydro China Beijing Engineering Corporation Limited, Hydro China Northwest Engineering Corporation Limited, Hydro China Guiyang Engineering Corporation Limited. The research report of design and safety standards and engineering measures about 300?m grade high face rockfill dam. 2014. Chinese.

[14] Hydro China Guiyang Engineering Corporation Limited, China Hydropower Engineering Consulting Group Corporation, China Institute of Water Resources and Hydropower Research, Beijing Jiaotong University. The research report of safety evaluation methods about 300?m grade high face rockfill dam. 2016. Chinese.

[15] Hydro China Northwest Engineering Corporation Limited, China Institute of Water Resources and Hydropower Research, Nanjing Hydraulic Research Institute, Wuhan University, Hohai University. The research report of rockfills engineering characteristics and constitutive relation on 300?m grade high face rockfill dam. 2015. Chinese.

[16] China Institute of Water Resources and Hydropower Research, Tsinghua University, Wuhan University, Hohai University, Nanjing Hydraulic Research Institute. The research report of deformation characteristics and engineering measures on 300?m grade high face rockfill dam. 2016. Chinese.

[17] Deng G, Wang X, Wen Y, Yu S, Chen R. Study on conceptualization method of deformation pattern and horizontal breakage of face slab of concrete faced rockfill dam. J Hydraul Eng 2015;46(4):396–404. Chinese.

[18] Dalian University of Technology, China Institute of Water Resources and Hydropower Research, Tsinghua University, Hydro China Kunming Engineering Corporation Limited. The research report of anti-seismic safety and engineering measures on 300?m grade high face rockfill dam. 2014. Chinese.

[19] Hydro China Kunming Engineering Corporation Limited, Nanjing Hydraulic Research Institute, Tsinghua University, Wuhan University, China Geokon Instruments Co. Ltd. The research report of key technology of safety monitoring on 300?m grade high face rockfill dam. 2014. Chinese.

Related Research