Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM

Xinjiang Association for Science and Technology, Urumqi 830011, China

Received: 2017-05-24 Revised: 2017-06-24 Accepted: 2017-07-14 Available online: 2018-02-23

Next Previous

Abstract

The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tunneling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the tunnels constructed in the project, the Ka–Shuang tunnel, which is a single tunnel with a length of 283 km, is currently the longest water-conveyance tunnel in the world. The main tunnel of the Ka–Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sections, and 34 drilling-and-blasting sections, with 91 tunnel faces. The construction of the Ka–Shuang tunnel has been regarded as an unprecedented challenge for project construction management, risk control, and safe and efficient construction; it has also presented higher requirements for the design, manufacture, operation, and maintenance of the TBMs and their supporting equipment. Based on the engineering characteristics and adverse geological conditions, it is necessary to analyze the major problems confronted by the construction and systematically locate disaster sources. In addition, the risk level should be reasonably ranked, responsibility should be clearly identified, and a hierarchical-control mechanism should be established. Several techniques are put forward in this paper to achieve the objectives mentioned above; these include advanced geological prospecting techniques, intelligent tunneling techniques combined with the sensing and fusion of information about rock parameters and mechanical parameters, monitoring and early-warning techniques, and modern information technologies. The application of these techniques offers scientific guidance for risk control and puts forward technical ideas about improving the efficiency of safe tunneling. These techniques and ideas have great significance for the development of modern tunneling technologies and research into major construction equipment.

Figures

Fig.1

Fig.2

Fig.3

Fig.4

Fig.5

Fig.6

Fig.7

Fig.8

References

[ 1 ] Zheng YL, Zhang QB, Zhao J. Challenges and opportunities of using tunnel boring machines in mining. Tunn Undergr Space Technol 2016;57:287–99. link1

[ 2 ] Liu Q, Huang X, Gong Q, Du L, Pan Y, Liu J. Application and development of hard rock TBM and its prospect in China. Tunn Undergr Space Technol 2016;57:33–46. link1

[ 3 ] Zhang J. Application of TBM in water diverting project from Yellow River at Wanjiazhai, Shanxi. Construct Mach 2003;2:32–3. Chinese.

[ 4 ] Deng M. Key techniques for group construction of deep-buried and super-long water transfer tunnel by TBM. Chin J Geotech Eng 2016;38(4):577–87. Chinese. 122 link1

[ 5 ] Wang MS, Wang ZS. Construction technology of TBM driving across fracture zone. Tunn Construct 2001;21(3):1–4. Chinese.

[ 6 ] Du Y, Xu X, Zhi X. Full-face rock tunnel boring machine: TBM maintenance and monitoring. Wuhan: Huazhong University of Science and Technology Press; 2013. Chinese.

[ 7 ] Zhao Y, Jiang H. Present situation analysis and new development of tunnel advance forecast technology. Highway Tunn 2010;1:1–7. Chinese.

[ 8 ] Jie S. The three-dimensional seismic ahead prospecting method and its application for adverse geology in tunnel construction [dissertation]. Jinan: Shandong University; 2016. Chinese.

[ 9 ] Li SC, Nie LC, Liu B, Tian MZ, Wang CW, Song J, et al. Advanced detection and physical model test based on multi-electrode sources array resistivity method in tunnel. Chin J Geophys 2015;58(4):1434–46. Chinese.

[10] Li C, Gu T, Liao Y, Ding J. Discussion on TBM construction through faults, karst, groundwater and other poor geological sections. J Eng Geology 2011;19 (Suppl):396–401. Chinese.

[11] He F, Guo R, Li S, Lin Y, Ran M, Shan Z. Prediction of water gushing in front of pile surface by rock mass temperature tunnel. Chengdu: Southwest Jiaotong University Press; 2009. Chinese.

[12] Zhu G, Qian G, Zhang C. Simulation of DC focusing electric field in tunnel based on APDL. J Huazhong Univ Sci Technol 2015;43(12):52–5. Chinese.

[13] Liu Q, Liu J, Pan Y, Kong X, Cui X, Huang S, et al. Research advances of tunnel boring machine performance prediction models for hard rock. Chin J Rock Mech Eng 2016;35(S1):2766–86. Chinese.

[14] Tan Q, Sun X, Xia Y, Cai X, Zhu Z, Zhang J, et al. A wear prediction model of disc cutter for TBM. J Cent South Univ 2017;48(1):54–60. Chinese.

Related Research