The Ceneri Base Tunnel: Construction Experience with the Southern Portion of the Flat Railway Line Crossing the Swiss Alps

Pini Swiss Engineers, Lugano 6900, Switzerland

Received: 2017-04-05 Revised: 2017-08-11 Accepted: 2017-09-22 Available online: 2018-04-07

Next Previous

Abstract

This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the flat railway line crossing the Swiss Alps from north to south. The project consisted of a twin tube with a diameter of 9 m interconnected by crosspassages, each 325 m long. In the middle of the alignment and at its southern end, large caverns were excavated for logistical and operational requirements. The total excavation length amounted to approximately 40 km. The tunnel crossed Alpine rock formations comprising a variety of rock typologies and several fault zones. The maximum overburden amounted to 850 m. The excavation of the main tunnels and of the cross-passages was executed by means of drill-and-blast (D&B) excavation. The support consisted of bolts, meshes, fiber-reinforced shotcrete and, when required, steel ribs. A gripper tunnel boring machine (TBM) was used in order to excavate the access tunnel. The high overburden caused squeezing rock conditions, which are characterized by large anisotropic convergences when crossing weaker rock formations. The latter required the installation of a deformable support. At the north portal, the tunnel (with an enlarged cross-section) passed underneath the A2 Swiss highway (the major road axis connecting the north and south of Switzerland) at a small overburden and through soft ground. Vertical and subhorizontal jet grouting in combination with partial-face excavation was successfully implemented in order to limit the surface settlements. The south portal was located in a dense urban area. The excavation from the south portal included an approximately 220 m long cut-and-cover tunnel, followed by about 300 m of D&B excavation in a bad rock formation. The very low overburden, poor rock quality, and demanding crossing with an existing road tunnel (at a vertical distance of only 4 m) required special excavation methods through reduced sectors and special blasting techniques in order to limit the blast-induced vibrations. The application of a comprehensive risk management procedure, the execution of an intensive surface survey, and the adaptability of the tunnel design to the encountered geological conditions allowed the successful completion of the excavation works.

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Fig. 7

Fig. 8

Fig. 9

Fig. 10

Fig. 11

Fig. 12

Fig. 13

Fig. 14

Fig. 15

Fig. 16

Fig. 17

Fig. 18

Fig. 19

Fig. 20

Fig. 21

Fig. 22

Fig. 23

Fig. 24

Fig. 25

Fig. 26

Fig. 27

Fig. 28

References

[ 1 ] AlpTransit Gotthard, Ltd. New traffic route through the heart of Switzerland, [Internet]. Lucerne: AlpTransit Gotthard, Ltd.; c2017 [cited 2018 Jan 9]. Available from:https://www.alptransit.ch/fileadmin/dateien/media/ publikationen/atg_broschuere_cbt_2017_en.pdf.

[ 2 ] Barpi F, Peila D. Influence of the tunnel shape on shotcrete lining stresses. Comput Aided Civ Infrastruct Eng 2012;27(4):260–75. link1

[ 3 ] Oggeri C, Peila D, Pelizza S. Main features of tunnel construction and lining. In: Plizzari G, editor. Construction methodologies and structural performance of tunnel linings. Brescia: Starrylink Editrice; 2009. p. 1–8.

[ 4 ] Loew S, Barla G, Diederichs M. Engineering geology of Alpine tunnels: past, present and future. In: Williams A, Pinches C, Chin C, McMorran T, Massey C, editors. Proceedings of the 11th IAEG Congress; 2010 Sep 5–10; Auckland, New Zealand. Boca Raton: CRC Press; 2010. p. 201–54. link1

[ 5 ] Carter T. Prediction and uncertainties in geological engineering and rock mass characterization assessments. In: Proceedings of the 4th International Rock Mechanics and Rock Engineering Conference; 1992 Nov 24–27; Torino, Italy; 1992.

[ 6 ] Santarelli S, Camerotto A, Grosso N. Galleria di base del Monte Ceneri uno scavo in tradizionale ad elevata meccanizzazione. In: SIG—Innovazione nella Realizzazione di Opere in Sotterraneo Congress; 2014 Oct 23–24; Bologna, Italy; 2014. p. 33–42. Italian. link1

[ 7 ] Belloli A, Kälin A. Project-specific logistics for the Gotthard and Ceneri Base Tunnels. In: Anagnostou G, Ehrbar H, editors. Underground—the way to the future. Boca Raton: CRC Press; 2013. p. 1667–74.

[ 8 ] Cantieni L, Anagnostou G. The interaction between yielding supports and squeezing ground. Tunn Undergr Space Technol 2009;24(3):309–22. link1

[ 9 ] Kovári K. Design methods with yielding support in squeezing and swelling rocks. In: Proceedings of World Tunnel Congress 2009; 2009 May 23–28; Budapest, Hungary; 2009. link1

[10] Kovári K, Lunardi P. On the observational method in tunneling. In: Proceedings of the GeoEng 2000: an International Conference on Geotechnical & Geological Engineering; 2000 Nov 19–24; Melbourne, Australia; 2000. p. 692–707. link1

[11] ltasca Consulting Group, Inc. UDEC—universal distinct elements code, version 4.0—user’s manual. Minneapolis: ltasca Consulting Group, Inc.; 2004.

[12] Merlini D, Falanesca M. Ceneri Base Tunnel advancement in difficult rock conditions: tunnel design and construction optimization through back- analysis of the geomechanical parameters. In: Anagnostou G, Ehrbar H, editors. Underground—the way to the future. Boca Raton: CRC Press; 2013. p. 1722–9. link1

[13] Mezger F, Anagnostou G. On the non-uniformity of squeezing deformations in the Ceneri Base Tunnel. In: Proceedings of the ISRM Regional Symposium EUROCK 2015 & 64th Geomechanics Colloquium—Future Development of Rock Mechanics; 2015 Oct 7–10; Salzburg, Austria. Salzburg: Austrian Society for Geomechanics; 2015. p. 113–8. link1

[14] Oreste P. Back-analysis techniques for the improvement of the understanding of rock in underground constructions. Tunn Undergr Space Techol 2005;20 (1):7–21. link1

[15] Malaguti A, Morandi S, Stocker S. Anisotropic geomechanical behaviour of tunnelling Val Colla Line, Ceneri Base Tunnel, Switzerland. In: Anagnostou G, Ehrbar H, editors. Underground—the way to the future. Boca Raton: CRC Press; 2013. p. 1730–7. link1

[16] Fontana A. Durchörterung «Linea Val Colla» Planungs—und Ausführungsaspekte. In: Kolloquium Bauhilfsmassnahmen im Tunnelbau; 2012 Dec 13; Zurich, Switzerland; 2012. German. link1

[17] Anagnostou G, Serafeimidis K. The dimensioning of the tunnel face reinforcement. In: Hrdina I, editor. Underground space—the 4th dimension of metropolises, three volume set +CD-ROMITA. Boca Raton: CRC Press; 2007. p. 291–6. link1

[18] Bonini M, Lancellotta G, Barla G. State of stress in tunnel lining in squeezing rock conditions. Rock Mech Rock Eng 2013;46(2):405–11. link1

[19] Merlini D, Morandi S, Falanesca M. Ceneri Base Tunnel: design and excavation of large caverns. In: Proceedings of ITA WTC 2015 Congress and 41st General Assembly; 2015 May 22–28; Dubrovnik, Croatia; 2015.

[20] Como G, Ferrari A, Gubler G. Tunnel Vedeggio-Cassarate: Vortrieb in wassergesättigtem Lockergestein. In: Publications de la Société suisse de mécanique des sols et des roches, Réunion de printemps; 2008 Avril 25; Lugano, Switzerland; 2008. p. 113–21. German. link1

[21] Gugelmann B. The challenges of opposed tunnelling Vezia. In: Proceedings of the Swiss Tunnel Congress 2011, Band 10; 2011 Jun 8–9; Lucerna, Switzerland; 2011. p. 62–75.

[22] Rossi F, Filippini R, KovÃri K. Ceneri Base Tunnel. Cavern beneath a Motorway Embankment. In: Swiss Tunnel Congress 2013; 2013 Jun 4–5; Gevena, Switzerland; 2013.

Related Research