Developments and Prospects of Long-Span High-Speed Railway Bridge Technologies in China

China Railway Major Bridge Reconnaissance and Design Institute Co., Ltd., Wuhan 430050, China

Available online: 2017-12-30

Next Previous

Abstract

With the rapid developments of the high-speed railway in China, a great number of long-span bridges have been constructed in order to cross rivers and gorges. At present, the longest main span of a constructed high-speed railway bridge is only 630 m. The main span of Hutong Yangtze River Bridge and of Wufengshan Yangtze River Bridge, which are under construction, will be much longer, at 1092 m each. In order to overcome the technical issues that originate from the extremely large dead loading and the relatively small structural stiffness of long-span high-speed railway bridges, many new technologies in bridge construction, design, materials, and so forth have been developed. This paper carefully reviews progress in the construction technologies of multi-function combined bridges in China, including combined highway and railway bridges and multi-track railway bridges. Innovations and practices regarding new types of bridge and composite bridge structures, such as bridges with three cable planes and three main trusses, inclined main trusses, slab-truss composite sections, and steel-concrete composite sections, are introduced. In addition, investigations into high-performance materials and integral fabrication and erection techniques for long-span railway bridges are summarized. At the end of the paper, prospects for the future development of long-span high-speed railway bridges are provided.

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Fig. 7

Fig. 8

Fig. 9

References

[ 1 ] Gao ZY. Technical characteristics of main bridge of Hutong Changjiang River Bridge. Bridge Constr 2014(2):1–5. Chinese.

[ 2 ] Qin SQ, Gao ZY, Pan DF. Research of key techniques for Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge. Bridge Constr 2007 (1):1–4. Chinese.

[ 3 ] Gao ZY. Overall design of Wuhan Tianxingzhou Changjiang River Rail-cum- Road Bridge. Bridge Constr 2007(1):5–9. Chinese. link1

[ 4 ] Tang HQ, Xu GY, Liu HS. Feasibility analysis of applying of suspension bridge type to railway bridges. Bridge Constr 2017(2):13–8. Chinese.

[ 5 ] Xiao HZ, Xu W, Gao ZY. Design of Anqing Changjiang River Railway Bridge. Bridge Constr 2009(5):6–8. Chinese. link1

[ 6 ] Wang ZP, Du P. A study on the co-action between floor system and main truss of six-line railways steel truss girder cable-stayed bridge. Eng Technol Res 2017(2):14–7. Chinese.

[ 7 ] Gao ZY, Yi LX, Xiao HZ. Dashengguan Bridge—The largest span steel arch bridge for high-speed railway. Struct Eng Intern 2010;20(3):299–300. link1

[ 8 ] Yi LX. Design and study of long span steel truss arch bridge of Dashengguan Changjiang River Bridge in Nanjing. Bridge Constr 2009(5):1–5. Chinese. link1

[ 9 ] Xu W. Design of steel girder of main bridge of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge. Bridge Constr 2008(1):4–7. Chinese.

[10] Gao ZY. Zhengzhou Yellow River Road-cum-Railway Bridge, China. Stahlbau 2012;81(2):151–5. link1

[11] Xiao HZ, Gao ZY. Structural design on main part of Yellow River Rail-Road Bridge in Zhengzhou. Railway Invest Survey 2007(S1):30–4. Chinese.

[12] Li WH, Yang GW, Wei X. Design of steel truss girder cable-stayed bridge of 567 m main span of Huanggang Changjiang River Rail-cum-Road Bridge. Bridge Constr 2013(2):10–5. Chinese.

[13] Wan TB, Zhang Q. Key techniques for design of main bridge of Tongling Changjiang River Rail-cum-Road Bridge. Bridge Constr 2014(1):1–5. Chinese.

[14] Gao ZY. Technical innovations of Zhengzhou Huanghe River Rail-cum-Road Bridge. Bridge Constr 2010(5):3–6. Chinese. link1

[15] Wang YW. Construction techniques for erection of arch rib of main bridge of Guizhou Yachi River Bridge on Chengdu-Guiyang Railway. Bridge Constr 2017;47(1):104–8. Chinese.

[16] Mei DP, Yi LX. Criterion of mechanical behavior of welded joints of Q420qE high strength structural steel. Bridge Constr 2010(5):20–3. Chinese.

[17] Yi LX, Gao ZY, Chen WX. Development and application of high-performance structural steel for Hutong Changjiang River Bridge. Bridge Constr 2015 (6):36–40. Chinese.

[18] Xiao HZ, Yi LX. Design of superstructure of main bridge of Nanjing Dashengguan Changjiang River Bridge. Bridge Constr 2010(1):1–4. Chinese. link1

[19] Gao ZY, Mei XY, Xu W, Zhang YF. Overall design of Hutong Changjiang River Bridge. Bridge Constr 2015(6):1–6. Chinese.

[20] Li W, Zhang Q. Study of anchoring parameters design for stay cable of Tongling Changjiang River Rail-cum-Road Bridge. World Bridges 2013(6):67–71. Chinese.

[21] Yang JH, Hu HB. Assembling techniques for full blocks of steel truss girder of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge. Bridge Constr 2008(6):5–7. Chinese. link1

[22] Yan HB, Zheng ZY, Huang XY. Manufacturing techniques for all-welded units of steel girder of Tongling Changjiang River Rail-cum-Road Bridge. Bridge Constr 2014(1):6–10. Chinese.

[23] Guan Y, Chen T, Tang Y, Song HF. Techniques for segmental assembling of main ship channel of Hutong Changjiang River Rail-cum-Road Bridge. Bridge Constr 2016(6):13–7. Chinese.

[24] Sun YJ, Xu W. Design of composite double decks and fully welded steel truss girder of Pingtan Strait Rail-cum-Road Bridge. Bridge Constr 2016(1):1–5. Chinese.

[25] Gao ZY. Cable-supported bridges with multiple towers. Beijing: China Railway Publishing House; 2016. Chinese.

[26] Shao CY. Study for structural system and performance of 3-pylon cable-stayed Yiling Changjiang River Bridge. In: Proceedings of the 9th National Conference on Structural Engineering; 2000 Sep 16–20; Chengdu, China. Beijing: Engineering Mechanics Press; 2000. p. 272–7. Chinese.

[27] Hu JH. Project design of Dongting Lake Bridge. Hunan Commun Sci Technol 1998;24(1):24–9. Chinese.

[28] Chen W, Zhang DP. Research of structural system schemes for Wuhan Erqi Changjiang River Bridge. Bridge Constr 2011(1):1–4. Chinese. link1

[29] Wei J, Wang BB. Jinan Jianbang Yellow River Main Bridge design. Energy Conserv Environ Protect Transport 2015(3):88–91. Chinese.

[30] Zhang XG, Wang RG, Lin DJ, Wu WS. Structural system design of multiple towers cable stayed Jiashao Bridge. Highway 2013(7):286–9. Chinese.

[31] Yang J. Technical ideas of conceptual design of three-tower suspension bridge for main bridge of Taizhou Changjiang River Highway Bridge. Bridge Constr 2007(3):33–5. Chinese. link1

[32] Yang GW, Xu HG, Zhang Q. Study of key techniques for three-tower suspension bridge of Maanshan Changjiang River Bridge. Bridge Constr 2010(5):7–11. Chinese. link1

[33] Wang ZB, Yang J, Zhou P. Study of steel and concrete composite girder suspension bridge scheme for Yingwuzhou Changjiang River Bridge. Bridge Constr 2010(4):52–6. Chinese. link1

[34] Gao ZY, Shi FH. Key techniques of design of main bridge of Oujiang River North Estuary Bridge in Wenzhou. Bridge Constr 2017(1):1–5. Chinese.

Related Research