Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Engineering >> 2017, Volume 3, Issue 6 doi: 10.1016/j.eng.2017.12.009

A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines

a Excavation Engineering and Earth Mechanics Institute, Department of Mining Engineering, Colorado School of Mines, Golden, CO 80401, USA
b Geotechnical Engineering Research Institute, Korea Institute of Civil Engineering and Building Technology, Goyang 10223, Korea

Available online: 2017-12-30

Next Previous

Abstract

The success of a tunnel-boring machine (TBM) in a given project depends on the functionality of all components of the system, from the cutters to the backup system, and on the entire rolling stock. However, no part of the machine plays a more crucial role in the efficient operation of the machine than its cutterhead. The design of the cutterhead impacts the efficiency of cutting, the balance of the head, the life of the cutters, the maintenance of the main bearing/gearbox, and the effectiveness of the mucking along with its effects on the wear of the face and gage cutters/muck buckets. Overall, cutterhead design heavily impacts the rate of penetration (ROP), rate of machine utilization (U), and daily advance rate (AR). Although there has been some discussion in commonly available publications regarding disk cutters, cutting forces, and some design features of the head, there is limited literature on this subject because the design of cutterheads is mainly handled by machine manufacturers. Most of the design process involves proprietary algorithms by the manufacturers, and despite recent attention on the subject, the design of rock TBMs has been somewhat of a mystery to most end-users. This paper is an attempt to demystify the basic concepts in design. Although it may not be sufficient for a full-fledged design by the readers, this paper allows engineers and contractors to understand the thought process in the design steps, what to look for in a proper design, and the implications of the head design on machine operation and life cycle.

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Fig. 7

Fig. 8

Fig. 9

Fig. 10

Fig. 11

Fig. 12

Fig. 13

Fig. 14

Fig. 15

Fig. 16

References

[ 1 ] Ates U, Bilgin N, Copur H. Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects. Tunn Undergr Space Technol 2014;40:46–63. link1

[ 2 ] Snyder LL. New design of hard rock TBMs. In: Proceedings of 1989 rapid excavation and tunnelling conference. Littleton: Society for Mining, Metallurgy, and Exploration, Inc.; 1989. p. 756–67.

[ 3 ] Sun W, Ling J, Huo J, Guo L, Song X. Study of TBM cutterhead fatigue damage mechanisms based on a segmented comprehensive failure criterion. Eng Failure Anal 2015;58(Pt 1):64–82. link1

[ 4 ] Genga Q, Wei Z, Menga H, Maciasb FJ. Mechanical performance of TBM cutterhead in mixed rock ground conditions. Tunn Undergr Space Technol 2016;57:76–84. link1

[ 5 ] Lee SW, Chang SH, Park KH, Kim CY. TBM performance and development state in Korea. Procedia Eng 2011;14:3170–5. link1

[ 6 ] Cho JW, Jeon S, Yu SH, Chang SH. Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method. Tunn Undergr Space Technol 2010;25(3):230–44. link1

[ 7 ] Rostami J, Ozdemir L. Computer modeling for cutterhead design and layout of mechanical excavators. In: Proceedings of the 12th annual technical meeting of the institute of shaft drilling technology; 1993 May 3–5; Las Vegas, NV, USA. 1993. p. 2–6.

[ 8 ] Rostami J. Hard rock TBM cutterhead modeling for design and performance prediction. Geomech Tunn 2008;1(1):18–28. link1

[ 9 ] Huo J, Sun W, Chen J, Zhang X. Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns. Comput Ind Eng 2011;61(4):1209–25.

[10] Rostami J. Rock cutting tools for mechanical mining. In: Proceedings of society for mining, metallurgy and exploration (SME) annual meeting. Littleton: Society for Mining, Metallurgy, and Exploration, Inc.; 2001.

[11] Rostami J. Disc cutter technology for hard rock tunneling. Tunnels Tunnelling Int 1998 Apr:42–4.

[12] Roby J, Sandell T, Kocab J, Lindbergh L. The current state of disc cutter design and development directions. Tunnel Undergr Constr 2009 Mar:36–45. link1

[13] The Niagara tunnel project [Internet]. Solon: The Robbins Company; [cited 2017 Oct 26]. Available from: http://www.therobbinscompany.com/ projects/niagara-tunnel-project/.

[14] Rostami J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure [dissertation]. Golden: Colorado School of Mines; 1997. link1

[15] Rostami J. Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters. Int J Rock Mech Min 2013;57:172–86. link1

[16] Chang SH, Choi SW, Bae GJ, Jeon S. Performance prediction of TBM disc cutting on granitic rock by the linear cutting test. Tunn Undergr Space Technol 2006;21(3–4):271. link1

[17] Sanio HP. Prediction of the performance of disc cutters in anisotropic rock. Int J Rock Mech Min 1985;22(3):153–61. link1

[18] Sato K, Gong F, Itakura K. Measurement of tool force and twist exerted on TBM disc cutters. In: Proceedings of 2nd international symposium on mine mechanization and automation. Rotterdam: A.A. Balkema; 1993. p. 271–8.

[19] Sato K, Gong F, Itakura K. Prediction of disc cutter performance using a circular rock cutting rig. In: Proceedings of 1st international symposium on mine mechanization and automation. Golden: Colorado School of Mines; 1991. p. 31–40. link1

[20] Gertsch R, Gertsch L, Rostami J. Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction. Int J Rock Mech Min 2007;44 (2):238–46. link1

[21] Medel-Morales RC, Botello-Rionda S. Design and optimization of tunnel boring machines by simulating the cutting rock process using the discrete element method. Computación y Sistemas 2013;17(3):329–39. link1

[22] Willis D. Main beam TBM makes great time in Mumbai [Internet]. TunnelTalk; 2014 Feb 25 [cited 2017 Nov 29]. Available from: http://www.tunneltalk.com/ Mumbai-India-25Feb14-Robbins-main-beam-TBM-makes-great-time-in- Mumbai.php.

[23] Bruland A. Hard rock tunnel boring [dissertation]. Trondheim: Norwegian University of Science and Technology; 1998.

[24] Alborz exploration tunnel [Internet]. Schruns: Jäger Bau GmbH; [cited 2017 Nov 26]. Available from: http://www.jaegerbau.com/en/underground- construction/special-underground-projects/reference-projects/alborz-exploration-tunnel/.

[25] Cigla M, Ozdemir L. Computer modeling for improved production of mechanical excavators. In: Proceedings of society for mining, metallurgy and exploration (SME) annual meeting. Littleton: Society for Mining, Metallurgy, and Exploration, Inc.; 2000.

Related Research