Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Engineering >> 2019, Volume 5, Issue 3 doi: 10.1016/j.eng.2019.04.001

Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland

Lombardi Engineering Ltd., Minusio 6648, Switzerland

Available online: 2019-04-11

Next Previous

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

References

[ 1 ] Leuenberger M. In the year of the tunnel. In: Proceeding of the Swiss Tunnel Congress 2016; 2016 Jun 15–17; Luzern, Switzerland. Zurich: Swiss Tunnelling Society; 2016. German.

[ 2 ] Ehrbar H, Zbinden P. Organisation and processes. In: Tunnelling the Gotthard. Zurich: Swiss Tunnelling Society; 2016. p. 592–601. link1

[ 3 ] Dix A, Smith M, Celestino T, Neuenschwander M. Contractual practice. 2015- Activity report of Working Group 3 [Internet]. Geneva: ITA-AITES [cited 2019 Feb 19]. Available from: https://www.ita-aites.org/en/wg-committees/ working-groups/200-ita-active-working-groups/workinggroup-3-contractualpractices/894-2015-activity-report.

[ 4 ] ITA-AITES. The ITA contractual framework checklist for subsurface construction contracts. Geneva: ITA-AITES; 2011. Apr. ITA-AITES Report No.: 006. link1

[ 5 ] Ehrbar H, Zbinden P. Financing and cost management. In: Tunnelling the Gotthard Zurich. Regensdorf: Swiss Tunnelling Society; 2016. p. 614–23. link1

Related Research