Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Engineering >> 2022, Volume 14, Issue 7 doi: 10.1016/j.eng.2022.04.006

A 150 000 t·a−1 Post-Combustion Carbon Capture and Storage Demonstration Project for Coal-Fired Power Plants

a CHN Energy New Energy Technology Research Institute Co., Ltd., Beijing 100025, China

b GD Power Development Co., Ltd., Beijing 100101, China

CHN Energy Jinjie Energy Co., Ltd., Shaanxi 718001, China

Available online: 2022-06-30

Next Previous

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Fig. 7

Fig. 8

References

[ 1 ] Gao W, Liang S, Wang R, Jiang Q, Zhang Yu, Zheng Q, et al. Industrial carbon dioxide capture and utilization: state of the art and future challenges. Chem Soc Rev 2020;49(23):8584–686. link1

[ 2 ] Eide LI, Batum M, Dixon T, Elamin Z, Graue A, Hagen S, et al. Enabling large-scale carbon capture, utilisation, and storage (CCUS) using offshore carbon dioxide (CO2) infrastructure developments—a review. Energies 2019;12(10):1945. link1

[ 3 ] Dumée L, Scholes C, Stevens G, Kentish S. Purification of aqueous amine solvents used in post combustion CO2 capture: a review. Int J Greenhouse Gas Control 2012;10:443–55. link1

[ 4 ] Zhang X. Application prospect of CCUS in China under the target of carbon neutrality. China Sustainability Trib 2020;12:22–4. Chinese. link1

Related Research