Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Frontiers of Engineering Management >> 2018, Volume 5, Issue 2 doi: 10.15302/J-FEM-2018040

Performance of seven highway construction contracting methods analyzed by project size

. School of Management, Guangzhou University, Guangzhou 510006, China.. Rinker School of Construction Management, University of Florida, Gainesville, FL 32611, USA

Accepted: 2018-04-12 Available online: 2018-06-28

Next Previous

Abstract

The conventional Design-Bid-Build (DBB) construction contracting method has had various drawbacks exposed in highway construction practice, including lack of communication, inefficient design, antagonizing relationships, and increased disputes. To mitigate the negative aspects of DBB, several alternative contracting methods and alternative project delivery systems have been devised and introduced to the industry over the past 30 years. Five such innovations were tested by a research team from the University of Florida under the sponsorship of the Florida Department of Transportation (FDOT). To perform a realistic assessment, this study categorized FDOT projects built between 2006 and 2015 into groups according to current contract amounts. Both absolute and relative metrics were defined and employed. For comparison purposes, a collective analysis on all gathered data was performed. Additionally, the influence of outliers on the results was examined. The results showed that analyses based on individual cost categories are more convincing because large projects tend to impose stronger influence on the analyses. In addition, outliers must be identified and screened to reach realistic and reliable conclusions. With regard to the actual performance of the contracting methods, each performs differently within different cost categories.

Related Research