Technical Breakthroughs in the Construction of TGP

China Yangtze Three Gorges Project Development Corporation, Yichang, Hubei 443002, Chian

Received: 2002-08-16 Revised: 2002-11-27 Available online: 2003-02-20

Next Previous

Abstract

The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made on the issues such as river closure of the Grand Channel and concrete construction of the cutoff wall, prompt concrete construction of dam, high slope construction of permanent shiplock, large-scale steel-lined reinforced concrete penstocks of power station and temperature and pressure maintaining of the spiral case, asphalt concrete core wall, metal works of the shiplock, turbine generating units, and so on.

References

[ 1 ] 陆佑楣.三峡工程建设项目管理的实践[J].中国三峡建设, 2002, (1) :4~6 link1

[ 2 ] 张超然, 戴会超.三峡水利枢纽建设概况和若干关键技术问题[J].水力发电, 1998, (1) :16~19 link1

[ 3 ] 张超然, 戴会超.三峡工程重大科学技术问题的研究[J].水利水电技术, 1998 (1) :10~15 link1

[ 4 ] 戴会超.三峡大坝混凝土快速施工方案及工艺研究[J].中国三峡建设, 2002 (7) :10~12 link1

Related Research