Abstract

A new model has been developed for studying the mechanism of infiltration destruction by contact scouring between the hardpan and grid. The permeability of coarseness gap that formed by different lithology is substituted by the permeability of slippery cranny, and the permeability of the stratum can be expressed by a combination of the permeability of gap and sand and gravel. The starting speed of the fine sand can be used as differentiation criterion. To calculate the fine sand moving by stabilization flow theorem in different time part, the fine sand near the orifice flows out of the stratum at the beginning. At first the permeability coefficient near the orifice becomes larger, and then it developes inside. It will develope rapidly in the direction perpendicular to tho bank, and even forms a concentrate leakage passage.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

References

[ 1 ] 毛昶熙主编.渗流计算分析与控制[M].北京:中国水利水电出版社,1990

[ 2 ] 陈建生,李兴文,赵维炳.堤防管涌产生集中渗漏通道机理与探测方法研究[J].水利学报,2000,(9):48~54

[ 3 ] 薛禹群,朱学愚.地下水动力学[M].北京:地质出版社,1982

Related Research