Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2003, Volume 5, Issue 12

Study on the Model and Its Visualization for Dynamic Allocation of Earth

1. School of Civil Engineering, Tianjin University, Tianjin 300072, China

2 .Middle South Hydroelectric Investigation & Design Institute of SPC, Changsha, 410014 China

Funding project:教育部高等学校优秀青年教师教学科研奖励计划资助项目(200166);国家自然科学基金资助项目(50179023) Received: 2003-06-05 Revised: 2003-08-11 Available online: 2003-12-20

Next Previous

Abstract

For construction organization plan, the optimized allocation and overall balance of earth is of great significance to reduce the project cost and ensure the construction period in the construction of rock-fill dam. Because of the characteristic of being influenced or constrained by time-space, a new method of changing its dynamic into static is presented with the system analysis based on the exising research. Meanwhile, Linear Programming is introduced to solve the problem. In order to strengthen the commonness and agility of model, some human interventions are in an in-depth and particular consideration in building the mathematics model. And then for the expression of results, Geographic Information System (GIS) is referred to demonstrate the allocation process with graph or animation to avoid its powerless expression. With the help of powerful VC+ + , corresponding software is drawn up, whose interface is friendly operation is easy and applicability is preferable. At last a large-scale rock-fill dam is illustrated. The successful application of the software to it shows the reasonability and effectiveness of the method.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 葛文辉.我国碾压式土石坝的发展[J].施工组织设计, 1992, (1) :1~8

[ 2 ] 蒋颂涛, 韩正海, 等.混凝土面板堆石坝设计与施工[M ].北京:水利电力出版社, 1991 link1

[ 3 ] 水利电力部水利水电建设总局.水利水电工程施工组织设计手册 (第二卷) [M ].北京:水利电力出版社, 1990

[ 4 ] 袁光裕编.水利工程施工 (第三版) [M].北京:中国水利水电出版社, 2001 link1

[ 5 ] MohamedMarzouk, OsamaMoselhi.Optimizingearthmovingoperationsusingobject orientedsimulation[J].Proceedingsofthe2000WinterSimulationConference, 2000:1926~1932

[ 6 ] GovindanKannan, JulioC .Martinez.Aframeworkforincorporatingdynamicstrategiesinearth movingsimulations[J].Proceedingsofthe1997WinterSimulationConference, 1997:1119~1126

[ 7 ] Henderson, VaughanE .Solvingtheshortestroutecutandfill problemusingsimulatedannealing[J ].EuropeanJournalofOperationalResearch, 2003, (145) :72~84

[ 8 ] 陈小平.高斯方程在土方调配计算中的应用[J].铁道建设, 1997, 3 (42) :13~16

[ 9 ] 梁向峰, 刘晓奇.线性规划在料场优化调配中的应用[J].陕西水力发电, 2001, 17 (3) :33~35 link1

[10] 刘琼芳.天生桥一级水电站土石方平衡规划与实施[J].云南水力发电, 2001, (2) :101~104 link1

[11] 郑家祥, 殷奎生.高土石坝施工过程计算机模拟[J].水电站设计, 1993, (2) :70~75 link1

[12] 申明亮, 杨树明, 等.堆石坝施工中料物调配问题研究[J].武汉水利电力大学学报, 2000, 33 (5) :16~18 link1

[13] 申明亮, 倪锦初.料物平衡方法研究与软件开发[J].人民长江, 2001, 32 (4) :25~26 link1

[14] 钟登华, 郑家祥, 等.可视化仿真技术及其应用[M].北京:中国水利水电出版社, 2002 link1

[15] KruglinskiJ, WingoS .VisualC ++6.0技术内幕[M].北京:北京希望电子出版社, 2001

[16] 《运筹学》教材编写组编.运筹学 (修订版) [M].北京:清华大学出版社, 1998 link1

[17] 孙锡衡, 齐东海.水利水电工程施工计算机模拟与程序设计[M ].北京:中国水利水电出版社, 1997

[18] 李德仁, 龚健雅, 边馥苓.地理信息系统导论[M], 北京:测绘出版社, 1993

[19] 曹 瑜, 胡光道.地理信息系统在国内外应用现状, 西南科技大学城建学院张文君地理信息系统资料网

[20] LiR .Datastructureandapplicationissuein3DGeographicalinformationsystem[J].Geomatic, 1991, 48 (3) :209~224

[21] LiZhilin.ObjectiverepresentationofDTMsurfaceinscaledimension[J].DynamicandMultiDimensionalGIS , 1999, 33 (4) :23~27

[22] 钟登华, 周 锐, 刘东海.水利水电工程施工系统三维建模与仿真[J].计算机仿真, 2003 (1) link1

Related Research