Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2004, Volume 6, Issue 1

Key Technical Issues of TGP Permanent Shiplock

China Yangtze Three Gorges Project Development Corporation , Yichang , Hubei 443002, China

Received: 2003-03-20 Revised: 2003-07-04 Available online: 2004-01-20

Next Previous

Abstract

To solve the high-dam navigation issue of the world class Three Gorges Project (TGP) is one of the key technical issues of the TGP. Special requirements exist in the TGP double-lane five-step shiplock in terms of general layout of navigation structures, sedimentation hindering to navigation, hydraulics of the water-conveyance system, high and steep slope treatment, manufacture and technology of main metal structures and mechanical and electric equipment, which have been resolved step by step by scientific tests, verification and engineering practice.

References

[ 1 ] 梁应辰.三峡工程通航建筑物[A].中国科学技术前沿[M ].上海:上海教育出版社, 1997.527~568

[ 2 ] 水利部长江水利委员会.长江三峡水利枢纽单项工程技术设计报告第三册[M ].武汉:水利部长江水利委员会, 1994

[ 3 ] 水利部长江水利委员会.三峡工程永久通航建筑物研究[M ].武汉:湖北科学技术出版社, 1997

Related Research