Strategic Study of CAE >> 2005, Volume 7, Issue 8
GIS-based Visual Simulation Methodology for Concrete Dam Construction Process and Its Application
1. College of Architecture and Civil Engineering, Shenzhen University, Shenzhen, Guangdong 518060, Chinas
2. School of Civil Engineering, Tianjin University, Tianjin 300072, China
Next Previous
Abstract
This paper presents a GIS-based visual simulation methodology for concrete dam construction process, in which system simulation techniques are integrated with visualization techniques. GIS-based visual simulation system (GVSS) was developed by the authors. GVSS is a powerful schedule planning tool offering visualizing and querying capabilities simultaneously. GVSS has been applied to a real concrete dam construction project, which verified the feasibility of the methodology and GVSS.
Keywords
visual simulation ; GIS ; concrete dam construction ; schedule ; optimization
References
[ 1 ] 李景茹.大型工程施工进度分析理论方法与应用[D].天津:天津大学博士学位论文, 2003 link1
[ 2 ] MilesSB, HoCH.RigorouslandslidehazardzonationusingNewmark’smethodandstochasticground motionsimulation[J].InternationalJournalofSoil DynamicandEarthquakeEngineering, 1999, 18, (4) :305~323
[ 3 ] HalpinDW.CYCLONE Methodformodelingjobsite processes[J].JournalofConstructionDivision, ASCE, 1977, 103 (3) :489~499
[ 4 ] 钟登华, 李景茹.全过程动态仿真技术及其在大型工程施工管理中的应用[J].天津大学学报, 2003, 36 (3) :347~352 link1