Abstract

The number, the height and the size of concrete dams under construction in China are the biggest ones in the world. Some important problems about concrete dams are discussed in this paper: (1) The key technique for terminating the history of “no dam without crack”.(2) Two kinds of guiding thoughts and two results of practical engineering for application of MgO concrete to dam. (3) Concrete mark based on 90 d or 180 d age is more appropriate for concrete dams than concrete class based on 28 d age . (4) The safety factor for compressive stress for the specially heigh concrete arch dam (higher than 200 m) is some what low in China (5) The equivalent stress in arch dams analysed by the finite element method.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 混凝土重力坝设计规范SDJ21-78[S].北京:水利电力出版社, 1979

[ 2 ] 混凝土重力坝设计规范DL 5108-1999[S].北京:中国电力出版社, 2000

[ 3 ] 混凝土拱坝设计规范SL 282-2003[S].北京:中国水利水电出版社, 2003

[ 4 ] 水工混凝土施工规范DL/T 5144-2001[S].北京:中国电力出版社, 2002

[ 5 ] Troxell G E, Davis H E.Composition and properties ofconcrete[M].New York, Mc Graw-Hill, 1956

[ 6 ] 朱伯芳, 许平.加强混凝土坝表面保护, 尽快结束“无坝不裂”的筑坝历史[J].水力发电, 2004, (3) link1

[ 7 ] 朱伯芳.论微膨胀混凝土筑坝技术[J].水力发电学报, 2000, (3) link1

[ 8 ] 朱伯芳, 张国新, 杨卫中, 等.应用氧化镁混凝土筑坝的两种指导思想和两种实践结果[J].水利水电技术, 2005, (6) link1

[ 9 ] 朱伯芳.论坝工混凝土标号与强度等级[J].水利水电技术, 2004, (8) link1

[10] 朱伯芳.论特高混凝土拱坝的抗压安全系数[J].水力发电, 2005, (2) link1

[11] 朱伯芳.国际拱坝学术讨论会专题综述[J].混凝土坝技术, 1987, (2) ;水力发电, 1988, (8) link1

[12] 傅作新, 钱向东.有限单元法在拱坝设计中的应用[J].河海大学学报, 1991, (2) link1

[13] 朱伯芳.拱坝应力控制标准研究[J].水力发电, 2000, (12) link1

[14] 朱伯芳, 等.拱坝设计与研究[M].北京:中国水利水电出版社, 2002. link1

Related Research