Application of Underground Fracture Connection Monitoring in Anpeng Alkali Mine

1. Anpeng Alkali Corp. , Tongbo, Henan 474775, China

2. CNPC Exploitation and Production Institute, Beijing 100083, China

Received: 2005-06-13 Revised: 2006-05-15 Available online: 2006-07-20

Next Previous

Abstract

In this paper, the theories, techniques, methodologies, and results of monitoring primary fractures connecting to the injection well in Anpeng Alkali Mine are presented, which combines micro-seismic monitoring with leveling survey techniques. By these theories, techniques and methodologies, the production well was located within the fractured band connecting to the injection well at a depth of over 1 000 meters, which makes it possible for continuous water injection and alkali solution production in Anpeng Alkali Mine.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 刘建中, 等.用微地震法监测油田生产动态[J].石油勘探与开发, 2004, 31 (2) :71~73. link1

[ 2 ] Philips W S, Rutledge J T, Faibanks T D, et al.Reservoir fracture mapping using microearthquakes:Twooilfield case studies[J].Reservoir Evaluation&Engineering, 1998, 114~121

Related Research