Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2006, Volume 8, Issue 7

Construction Project Investment Optimization Based on Genetic Algorithm

1. Construction College of Tianjin University, Tianjin 300072, China

2. Management College of Taiyuan Science and Technology University, Taiyuan 030024, China

Received: 2005-01-20 Revised: 2005-12-06 Available online: 2006-07-20

Next Previous

Abstract

In this paper, a time-cost-quality trade-off optimization model is set up by using multi-objective optimization theory and multi-attribute utility function theory. By applying network planning techniques and genetic algorithms to the model, the most satisfied decision result as well as several near satisfied alternative results can be obtained, which can be used to control the project investment. In the paper, a case study is given to verify the feasibility and practicability of the model. The application analysis and the results show that the model has practical value to some extent.

Figures

图1

图2

References

[ 1 ] Shih-Wen Hsiao.Fuzzy Logic Based Decision Models forProduct Design[J].International Journal of IndustrialErgonomics, 1998 (21) :103~116

[ 2 ] Do Ba Khang, Yin Mon Myint.Time, Cost and Qualitytrade-off in project management:a case study[J].International Journal of Project management, 1999, 17 (4) :249~256

[ 3 ] Mckim R, Hegazy T, Attalla M.Project performancecontrol in reconstruction projects[J].Journal ofConstruction Engineering and Management, 2000, 126 (2) :137~141

[ 4 ] Babu A J G, Suresh N.Project management with time, cost, and quality considerations[J].Europena Journal ofOperational Research, 1996, 88 (2) :320~327

[ 5 ] 陈耀明.工程建设项目多目标综合优化研究[J].中国管理科学, 2004, 12 (专刊) :173~176

[ 6 ] 闫皓, 贺仲雄.权重分析系统[J].系统工程与电子技术, 1992, (4) :41~45 link1

[ 7 ] 钟登华, 刘东海.基于遗传算法的施工导流建筑物优化[J].系统工程理论与实践, 2000, (10) :126~133 link1

Related Research